Scroll down to search for more products...
Industry Products
Featured Products
-
Power CAD, Simulation & Digital Twins
Accelerate simulation, CAD, and digital twin workflows with the NVIDIA RTX PRO 6000 Blackwell Workstation Edition. Get powerful AI-enhanced performance, advanced visualization, and enterprise-ready capabilities for demanding projects. -
Precision Motion with Brother Servo Gearboxes
Compact, low-backlash servo gearboxes built to deliver precise motion, high torque density, and reliable automation performance. -
The Next Evolution in Process Control Is Here
DeltaV™ version 16.LTS Distributed Control System (DCS) builds on decades of field-proven innovation to deliver the most robust and reliable release yet. -
Connect Operations, Data, and Insights with GENESIS
Stop struggling with disconnected data. GENESIS unifies SCADA, visualization, historian, and analytics in one platform.
25,376 Products
-
Eplan Presents Cloud-based Device Management System
With Eplan eStock–the new cloud-based device management system in the Eplan Platform 2023–device data including voltages, currents, datasheets and device designations can now be maintained in the Eplan Cloud. -
Rockwell Automation Delivers Expanded Hardware Support and Productivity with New Version of Studio 5000 Logix Designer V35
One of the most desired improvements to the Studio 5000 Logix Designer experience in the process industry is the expansion for the SequenceManager to include 5x80P controller support. -
AutomationDirect Adds New Models of Dold Safety Relays to Line of Safety Products
AutomationDirect has added new models of Dold safety relays to their line of safety products. -
Emerson Reinvents Pressure Relief Valves to Improve Performance and Reduce Emissions
The new Crosby Balanced Diaphragm and Bellows Leak Detection pressure relief valve solutions improve performance, safety and reliability while reducing emissions. -
FCI's Leading-edge AS-FS Dual Output Flow Sensor/Switch Is Fully Redundant With Separate Outputs
The new product is ideal for monitoring hydraulic fluid, lubricating oil, liquid cooling systems PACK Air and bleed air systems, fuel transfer and refueling. -
Endress+Hauser Launches New Generation of Liquid Analysis Sensors
Memosens 2.0 digital technology provides simple, safe, and connected liquid analysis. -
Rockwell Automation Reinforces New Capabilities in Emulation and Support with First Expansion of FactoryTalk Logix Echo
Virtualizing control systems with FactoryTalk Logix Echo can help customers save significant engineering efforts and financial expenditure at every stage of a project from start to finish. -
Thomson Introduces High-precision Miniature Lead Screws to Meet Demand for Compact Application Designs
Thomson Industries, Inc., a leading manufacturer of linear motion control solutions, has introduced a line of miniature lead screws and nuts. -
Siemens' TIA Portal V18 Enables More Efficient and Flexible Automation Engineering
At the SPS trade fair in Nuremberg from Nov. 8-10, Siemens presented Version 18 of its engineering framework TIA Portal (Totally Integration Automation Portal). -
Teledyne Cameras Enable VR Play at TOCA Social
A popular restaurant chain has selected Teledyne’s Genie Nano cameras for its sports themed VR restaurants. -
AutomationDirect Offers ProSense Float Level Switches
AutomationDirect has added more low-cost ProSense float level switches. -
Rockwell Automation Offers Comprehensive Endpoint Protection Services
For organizations to secure their operations and reduce cyber threats, a successful cybersecurity strategy requires solutions to secure endpoints—any device that is connected to a network outside of its firewall, including laptops, HMIs, switches, IoT devices and more. -
BRESSNER Technology Introduces Compact and Flexible All-in-one Embedded PC BOXER-6646-ADP
Hardware supplier BRESSNER Technology introduces the compact and flexible all-in-one embedded PC BOXER-6646-ADP with Intel Core 12th Gen. processor and expandable interface. -
Yokogawa Adds ZR802S Explosion-proof Converter to OpreX Analyzers Lineup
Yokogawa Electric Corporation has announced that it has developed the ZR802S explosion-proof converter and will be releasing it for sale as part of its OpreX Analyzers lineup in all markets on Dec. 12. -
Festo’s ADN-S Is Another Space Saver for Jobs in Tight Quarters
ADN-S pneumatic cylinders are shorter and lighter than similar units and offer many application advantages. -
Nordson Electronics Solutions Introduces SELECT Synchro Selective Soldering System
With synchronous motion, the SELECT Synchro system boosts throughput 20-40% for most applications in a 60% smaller footprint. -
ABB RobotStudio Takes to the Cloud, Enabling Real-time Collaboration
New features include simplified interfaces, version control and highly accurate simulation–making programming easier and faster. -
IKO Offers AutomationWare Electric Actuators for Optimal Positioning Accuracy and Control
IKO International has announced the U.S. availability of the Mech Series of E-actuators as part of its distribution partnership with AutomationWare. -
Endress+Hauser Releases Cerabar and Deltabar Pressure and Differential Pressure Instruments
New Cerabar and Deltabar pressure instruments provide simplicity, enable improved process safety and increased productivity. -
Dynam.AI Unveils Revolutionary Contextualized Machine Learning Capability as Key Part of Client Services
Patent-pending Context-Augmented Machine Learning (CAML) brings logic and reasoning to artificial intelligence use cases—and has already allowed one Dynam.AI client to autonomously monitor oil and gas facilities for loss of containment. -
FCI's FLT93C Thermal Flow Switch Helps Clean Up In Demanding Sanitary CIP Processes
The FLT93C Flow Switch from Fluid Components International (FCI) provides accurate liquid flow rate measurement for clean in place (CIP) system operational integrity. -
Advantech Releases All-in-one AI Camera for Industrial AI Vision Applications
Advantech, a leading industrial edge AI solutions provider, has announced the release of a new edge industrial AI camera—the ICAM-500. -
Yaskawa Presents Flexible Human-Collaborative Workcell for Robotic Welding
Designed for human-collaborative (HC) interaction, the highly flexible ArcWorld HC is a complete robotic welding solution for the fabrication of small- to medium-size parts. -
binder USA Introduces Its Most Compact M5 Connector with 360° Shielding for Interference-free Signal Transmission
binder USA expanded its series 707 portfolio with an M5 connector designed for use in exceptionally-small spaces. -
JAI Line Scan Camera Provides Simultaneous and Separate Imaging of Red, Green, Blue and Short Wave Infrared Light
JAI is announcing a new industrial prism-based line scan camera. -
Kallik Launches Industry’s First Mobile-based App Interface for its Veraciti Label and Artwork Management Platform
Kallik is the first label and artwork management solution provider to offer a fully mobile LAM solution with ground-breaking development of an App-based User Interface (UI). -
AWS Announces AWS Supply Chain
The new cloud application improves supply chain visibility and delivers actionable insights to mitigate supply chain risks, lower costs and improve customer experiences. -
Rockwell Automation Introduces GuardLink 2.0 with New EtherNet/IP Interface
GuardLink 2.0 offers advanced diagnostics by way of the new Allen-Bradley 432ES GuardLink EtherNet/IP On-Machine Interface or a combination of our Dual GuardLink Relay and EtherNet/IP Interface. -
TRACO Provides High-performance, Low-cost 30W DC-DC Converter with 4:1 Input Range
TRACO POWER announces it’s next generation of 30W DC-DC converters in the standard 1 x 1 inch footprint with the new THL 30WI series. -
Siemens Expands SIMATIC MICRO-DRIVE Servo-drive System for Extra-low-voltage Material Handling and Manufacturing Applications
User benefits include seamless network integration, integrated drive safety, versatility, easy installation and commissioning. -
Mujin Debuts QuickBot, a Plug-and-Play Robotic Case Handler to Simplify Warehouse Automation
The AMR & Logistics Show in Boston was the scene for QuickBot’s depalletizing debut and the announcement that QuickBot will be available for purchase via RaaS model. -
DFI Empowers Edge AI Deployment with EC70A-TGU Compact Fanless System
DFI, the leading global provider of embedded solutions and Edge AI computing technology across multiple industries, is releasing the new Edge AI inference computer EC70A-TGU. -
AutomationDirect Presents Contrinex Specialty Inductive Proximity Sensors
AutomationDirect has added new stainless-steel specialty inductive proximity sensors from Contrinex. -
i.safe MOBILE Presents the IS540.1, an Explosion-proof 5G Smartphone
With the introduction of the IS540.1 smartphone from i.safe MOBILE, the global innovation leader in explosion-proof mobile devices and solutions, a new era for explosion-proof mobile communication solutions begins -
Mikrotron 21-Megapixel Camera Leverages CXP-12 Interface for High-Speed Color Imaging
The EoSens 21CCX12-FM transmits up to 50Gbit/sec for minimum latency and jitter. -
SVS-Vistek Camera Detects Laser Beam Melting Errors During Additive Manufacturing Process
Leveraging a 29-Megapixel CCD camera from SVS-Vistek, the groundbreaking imaging solution is accurate, simple to implement and compatible with most commercial laser beam melting systems. -
Softing's dataFEED OPC Suite Extended Offers Additional Security for Data Integration with OPC UA Reverse Connect
With the integration of OPC UA Reverse Connect into its dataFEED OPC Suite Extended V5.22, Softing enables secure communication between OPC UA components in OT and IT that are separated by firewalls or DMZs. -
Grace Technologies Adds New Chekvolt Lockout/Tagout Safety Device to Portfolio
The ChekVolt is a Permanent Electrical Safety Device (PESD) that allows absence of voltage testing to be performed safely by qualified electricians using their trusted voltmeters. -
HiveMQ Enables Seamless IoT Data Integration to AWS
A new feature allows customers to integrate MQTT data into Amazon Kinesis Data Streams for IoT data analytics. -
Rockwell Automation Simplifies Smart Machine Development, Improves Micro800 Controllers and Design Software
Machine builders can save engineering time and costs with the enhanced Allen-Bradley Micro850 and Micro870 2080-Lx0E controllers using the latest Connected Components Workbench software from Rockwell Automation. -
Siemens Delivers High-performance with Dual Powered Protection Relay
Siemens is expanding its family of Reyrolle protection devices with the launch of the 7SR46. -
Canfield Connector Product Expansion Provides 4-Pin Capability to Popular GT Series
Canfield’s GT Series product line expansion brings simple and effective connection solutions to even more OEMs worldwide. -
Spartan Scientific Releases Innovative 2-Way Solenoid Valve
Spartan Scientific, a manufacturer of high-quality fluid & pneumatic automation components, releases a newly engineered addition to its solenoid valve lineup. -
AutomationDirect Offers Lutze Driveflex and Motionflex VFD Cables
AutomationDirect has added new LUTZE DRIVEFLEX and MOTIONFLEX variable frequency drive cables which provide supreme protection against electromagnetic interference (EMI). -
Rohde & Schwarz Increases Maximum Measurable Frequency of Diode Power Sensors to 90 GHz
Rohde & Schwarz, the only supplier of fast diode sensors for power measurements up to 67 GHz, is increasing the maximum measurable frequency of diode power sensors to 90 GHz; higher than any other diode sensor currently available. -
Cincoze's Embedded Computer DV-1000 Plays a Key Role in Predictive Maintenance
With the evolution of IIoT and AI technology, more and more manufacturing industries are introducing predictive maintenance to collect equipment data on-site. -
Yokogawa to Release CENTUM VP R6.10 Integrated Production Control System
Yokogawa Electric Corporation announces that on Dec. 13, it will release CENTUM VP R6.10, a new version of the flagship Yokogawa integrated production control system in the OpreX Control and Safety System lineup. -
FCI’s MT100 Multipoint Flow Meters Improve Boiler Air-Gas Combustion Efficiency To Reduce Fuel
Oil/gas refinery and other process engineers will find the MT100 Series Multipoint Mass Flow Meter from Fluid Components International provides the accurate air/gas flow measurements needed to optimize boiler performance to reduce expensive fuel gas consumption costs and polluting greenhouse waste gases. -
AutomationDirect Adds More Intrinsically Safe Isolation Barriers from STAHL
AutomationDirect has added more intrinsically safe isolation barriers from STAHL. -
congatec Introduces Ecosystem for TSN Networked Real-time Factories and Critical Infrastructures
congatec, a leading vendor of embedded and edge computing technology, has introduced its new ecosystem for TSN aimed at networked factories and critical infrastructures. -
Aetina Launches Systems and Platforms Powered by NVIDIA Jetson AGX Orin
Aetina has launched new Jetson systems and platforms designed for use in advanced AI and computer vision applications. -
Ecosorb Releases EcoLink for Remote Monitoring, Control, and Data Acquisition of Odor Control Systems
Industrial users can now connect their odor control systems to the cloud using EcoLink, enabling remote monitoring and operation, along with data capture around the clock. -
Yaskawa Introduces Versatile, High Payload PL800 Palletizing Robot
The newest robot in the PL-series line, the PL800 features an 800 kg payload capacity and is ideal for a variety of palletizing applications, layer picking and other logistical tasks for end-of-line or distribution automation. -
Mission Secure Releases Sentinel 5.0 Platform, Enabling Context-aware, Zero Trust Security for Critical Infrastructure OT
Mission Secure, a leader in OT and ICS cybersecurity, announced the release of its Sentinel 5.0 platform, a milestone in enabling Zero Trust security architectures for critical infrastructure. -
TDK’s Industrial Motion Sensors Bring Fault Tolerance to High-performance Navigation Applications
TDK Corporation extends the SmartIndustrial line of robust and accurate motion sensors and announces the availability of InvenSense IIM-46234 and IIM-46230 new high-performance fault-tolerant inertial measurement units (IMU) targeted at navigation applications that require accurate, stable and best-in-class bias instability at an affordable price. -
AutomationDirect Provides Additional Profiles of SureFrame T-slotted Rails
AutomationDirect has added additional profiles of SureFrame t-slotted rails. -
Endress+Hauser Enhances Proline Promass Q 300/500 with Intelligent 4-tube Technology
4-tube technology increases measurement accuracy for loading, unloading and transporting hydrocarbons in the oil and gas industry, and optimizes the flowmeter line for additional applications. -
Festo AI Solution Improves Machine Utilization, Product Quality and Energy Efficiency
Festo AX creates a digital bridge between operational technology and business intelligence. -
OleumTech Launches H2S Gas Detection Transmitters
OleumTech, a leading provider of industrial automation and IoT solutions, has introduced two new Hydrogen Sulfide (H2S) Gas Detection Transmitters. -
IDEC Announces New Low-Profile Touchless Switches
LED illumination and indoor/outdoor durability make these low-profile touchless switches ideal for clean and functional industrial and public applications. -
Festo Introduces New Data Access Solutions for Rockwell PLCs
IIoT and predictive analytics for Rockwell systems with Festo pneumatics can improve performance and reduce costs. -
Applied Motion Products Presents New Mini Planetary Gearmotors
Applied Motion Products New PH Series Mini Planetary Gearmotors are used with small step motors in NEMA 8, 11, and 14 frame sizes. -
AutomationDirect Offers Bryant Pin and Sleeve Devices
AutomationDirect has added Bryant pin and sleeve wiring devices to their current offering of low-cost wiring solutions. -
Advantech Announces ECU-1000 Series Intelligent IIoT Communication Gateways
Advantech, a leading supplier of industrial communication solutions, has introduced the new ECU-1100 intelligent wireless Industrial Edge gateway series. -
POSITAL Announces Next-Generation TILTIX Inclinometers
The updated tilt sensors feature improved performance, more flexible configuration options and faster delivery. -
TRACO Offers 15W DC-DC Converter in DIP-16 Package, Doubling Effective Power Density
TRACO POWER announces the release of four new families of 15 watt high-density DC-DC converters in the DIP-16 footprint. -
Siemens Expands Industrial Edge and Continues to Drive OT and IT Integration
The new virtual edge device and new Simatic IPC edge devices offer more flexibility when implementing IIoT applications. -
Takebishi's DeviceXPlorer OPC Server Is Now Available as a Free Trial at Iconics.com
ICONICS is honored to have been selected by Takebishi Corporation, the leading OPC products supplier in Asia, as their primary distribution partner for the Americas, Europe, the Middle East and Africa (EMEA). -
Robotics Plus Unveils Autonomous Modular Vehicle to Alleviate Agriculture Labor Shortages
Multi-use, modular platform Unmanned Ground Vehicle (UGV) automates tree and vine crop tasks, starting with intelligent spraying. -
Exact Metrology Introduces PolyScan XL Inspection Scanners
Ideal for medium-to-large aerospace castings or automotive sheet metal components, the scanners uses multiple cameras and projectors to inspect parts up to 2000mm. -
Emergent Vision Technologies Introduces 127.7 MP 25GigE Camera Featuring Sony IMX661 CMOS Sensor
Emergent Vision Technologies has introduced the 127.7 MP HB-127-S, the latest addition to its award-winning Bolt 25GigE cameras. -
NORD DRIVESYSTEMS Offers Robust, Reliable Drive Solutions for Demanding Bulk Material Handling Environments
NORD’s solutions include heavy-duty industrial gear units, electric motors, and intelligently controlled variable frequency drives. -
Endress+Hauser Redefines the 4-20mA RTD Temperature Transmitter with the iTEMP TMT31
This RTD head transmitter for Pt100/Pt1000 sensors provides high measurement accuracy, flexible use, and safe operation in a multitude of process industries. -
Teledyne Expands Its Genie Nano Portfolio with New 10GigE Cameras
The new series includes industry’s smallest 67 MP camera for high-performance image capture. -
Veo Robotics Launches High-performance Engine to Power 3D Safeguarding
FreeMove 2.0 engine adds support for complex applications and harsh environments as human-robot collaboration on facility floors increases. -
Kaman Measuring Announces KD-5100+ High Reliability Sensor System for Fast Steering Mirror Control
The product retains proven performance with updates to circuit layout, ground connections and sensor connectors. -
JAI Introduces New 8.1-megapixel UV Camera
JAI has introduced the Go Series GO-8105M-5GE-UV, a new 8.1-megapixel, UV-sensitive camera with a high performance 5GBASE-T (5 GigE) interface. -
IDEC's New Line of VFDs Provides Flexible Motor Control and Energy Savings
VFDs are quadruple-rated and support customizable logic, simplifying motor control and improving energy efficiency for more applications. -
Rockwell Automation Enables Better Asset Management and Visibility With My Equipment Subscription
The launch of My Equipment Digital enables new functionality with digital collection and updating of industrial automation asset data through the use of network-based devices. -
Kistler Presents Update to the Process Monitoring System maXYmos TL ML
An update to the process monitoring system maXYmos TL ML from Kistler is now available worldwide. -
Yaskawa Adds 30 kg Payload HC30PL Plug and Play Collaborative Palletizing Robot to HC-Series Line
Featuring a robust 30 kg payload and 1,700 mm maximum reach, the easy-to-use six-axis HC30PL human-collaborative robot facilitates safe and efficient fenceless palletizing, and can also be deployed in select handling, packaging and logistical applications of demanding production environments. -
Emerson’s Control System Update Lays Foundation for Software-Driven, Data-Centric Automation Platform
DeltaV version 15 helps drive faster, easier digital transformation to accelerate IT/OT convergence, enabling easy upgrades and modernization. -
POSITAL Announces Next-Generation TILTIX Inclinometers
Updated tilt sensors feature improved performance, more flexible configuration options and faster delivery. -
AutomationDirect Adds Quality Seifert Products to Its Existing Enclosure Thermal Management Lineup
AutomationDirect has added new quality Seifert products to their existing enclosure thermal management lineup. -
Siemens Launches Innovative Cloud-native Software for Electrical Design
Siemens’ Capital Electra X is a new cloud-native electrical design software as a service offering, targeting small to medium sized businesses. -
Mikrotron GigE Vision Camera Helps Reduce Cost Deploying Machine Vision Systems
The Mikrotron EoSens GE 1.3 megapixel CMOS camera features photo-sensitivity of 2500 ISO/ASA (monochrome) combined with global shutter to enable high-speed image acquisition in very low lighting conditions without the installation of complex, expensive illumination systems. -
InOrbit Launches Developer Edition and Expands Robot Orchestration Capabilities
Roboticists using Developer Edition gain full access to RobOps tools for comprehensive evaluation, streamlined InOrbit Connect certification, and enhanced fleet orchestration. -
Banner Introduces K100 Pro Beacon Series of Multicolor Beacons
Industrial beacon provides configurable indication for users who need highly visible status information. -
Yaskawa Introduces HC10 Mobile Integrated Workstation
This mobile station is well-suited for arc welding, assembly, machine tending, and pick and place tasks. -
Emerson Releases Movicon.NExT 4.2 SCADA-Based Software
Modular, scalable Movicon.NExT 4.2 built on open framework, improves performance, reduces deployment costs, features modern graphics and more. -
Nanotec Announces DF45 Brushless DC Motors
The new flat motors have a diameter of only 45 mm and, owing to their extremely compact design, are ideal for applications that require precise positioning in confined spaces. -
WAGO Introduces Open Tool Slot and Push-Button Distribution Terminal Blocks
WAGO’s new open tool slot and push-button TOPJOB S Distribution Terminal Blocks are just 9mm wide with 1 to 6 distribution. -
Siemens Releases MultiFieldbus Interface Module for SIMATIC ET 200SP
Launch of the new MultiFieldbus interface means the SIMATIC ET 200SP can now be used in applications that previously used only Modbus TCP or EtherNet/IP. -
AutomationDirect Adds Control and Signal Cables from Quabbin
These signal cables are available in shielded or unshielded versions, with conductor sizes from 24AWG to 16AWG, and with various conductor counts ranging from 2 to 25 conductors depending on cable size. -
Optimal Engineering Systems Releases Four Serial Communication Controlled Solenoid Drivers
These low cost, very high reliability, microcomputer based, compact 76.2 mm by 76.2 mm (3.00 in. by 3.00 in.) solenoid drivers are ideal for solenoids, relays, actuators and electromagnets in applications such as: Mixing, disconnects, door controls, cabinet locks, fire suppression systems, vending machines, valve control, transmission shifting, sorting and farm machinery. -
NewTek Hazardous Location Linear Position Sensors Monitor Structural Integrity of LNG Storage Tanks
NewTek Hazardous Location Position Sensors monitor the structural integrity of LNG tanks, helping to meet Federal Energy Regulatory Commission (FERC) regulations for structural health monitoring. -
Pulsar Measurement Announces Reflect Two-Wire Radar Sensors
A first in the Pulsar Measurement product portfolio, these sensors have been designed to provide the highest confidence in level measurement in the most challenging conditions. -
COVAL Announces Enhanced Range of Multi-Stage Vacuum Pumps for Heavy Duty Suction Applications
With its new CMS HD series of modular multi-stage vacuum pumps, COVAL offers a robust and powerful solution for applications requiring a high suction flow rate for the vacuum handling of a wide variety of objects. -
Endress+Hauser Launches CA78 and CA79 TOC Analyzers For Monitoring Low-TOC Values Precisely and Reliably
Endress+Hauser augments its liquid analysis portfolio in the life sciences, power & energy, semiconductor manufacturing, personal care, and disinfectant production sectors with the CA78 and CA79 online TOC analyzers, ensuring high water quality and safe operating conditions. -
Bosch Rexroth Expands Range of Linear Axes With PSK Precision Modules
Quick, dynamic und highly precise: Bosch Rexroth is expanding its range of linear axes by adding a new generation of PSK precision modules. -
Cincoze Announces New Open Frame Display Module CO-100 Series
Cincoze recently launched the CO-100 Series of open frame display modules with robust features and exclusive adjustable design for easy fitting into enclosures of different materials and thicknesses in industrial applications such as automation machines and kiosks. -
Teledyne DALSA Announces Falcon Area Scan Camera Series
The new Falcon4-CLHS models deliver higher resolution, added functionality and ease of use with a CLHS interface that has been engineered for industrial imaging applications requiring high-speed data transfer. -
Seifert Systems Introduces 4000 Series Filter Fans
Seifert Systems, Inc. introduces their 4000 Series filter fans. the series covers 70 UL listed filter fan models designed for enclosure applications. -
ABB Launches Smallest Industrial Robot
With its compact size, class-leading payload and unrivaled accuracy, the new IRB 1010 offers electronics manufacturers the opportunity to increase their production of devices including smart watches, earphones, sensors, and health trackers through automation. -
CODESYS Supports CPUs From Dragon Core
The market-leading IEC 61131-3 platform CODESYS supports the processors known as Dragon Core from the Chinese company Loongson. -
FCI MT100 Gas Emissions Flow Meter Obtains Best-In-Class Maintenance Interval Rating
The MT100’s 6-month interval not only far exceeds the 4-week interval required of the only other QAL1 compliant thermal mass flow meter, but also meets or exceeds the interval of other flow meter technologies such as differential pressure (DP) and ultrasonic (US). -
HMS Networks Expands Range of High-Performance Anybus Gateways
Thirteen new versions for data connectivity between EtherCAT, EtherNet/IP, Modbus TCP, PROFIBUS and PROFINET make it simple for users to connect between different control systems, remove automation islands and maximize operational performance. -
AutomationDirect Introduces LUTZE SILFLEX FBP Control Cables
More 20, 18, 14, and 12 AWG shielded and unshielded cables, an additional 16AWG shielded cable, and a new 10AWG shielded cable option are now available. -
Cincoze Announces Open Frame Display Module CO-100 Series
Cincoze recently launched the CO-100 Series of open frame display modules with robust features and exclusive adjustable design for easy fitting into enclosures of different materials and thicknesses in industrial applications such as automation machines and kiosks. -
SICK Announces Photoelectric Sensor for Leading-Edge Detection
This sensor provides the logistics and production markets a reliable solution to accommodate the ever-increasing variety of packaging shapes and sizes, and that provides a quick and easy installation experience. -
E+E Elektronik Offers Digital Sensing Module for Humidity and Temperature Measurement
The module is particularly suitable for price-sensitive applications in the HVAC sector but also is suitable for industrial applications. -
Emerson’s New I/O Interface Software Helps Future-Proof Operations
Emerson has released DeltaV IO.CONNECT, a new subscription software service designed to help plants simplify modernization with an open architecture pathway that makes it possible to transition to more efficient control schemes without the need to completely overhaul existing infrastructure. -
Optris Introduces Outdoor Protective Housing For Infrared Cameras
The new housing offers for the first time the possibility to integrate an infrared camera and an HD video camera together in one compact system. A compact USB server is also integrated in the housing. -
AMETEK Abaco Systems Boosts Processing Performance and Bandwidth in New SBC3513 Single Board Computer
The rugged, SOSA-aligned SBC is designed with 100Gb Ethernet data plane and PCIe Gen4 expansion plane for demanding applications. -
Bicker Elektronik Provides DC Emergency Power Supply for Industrial, Medical and Security Technology
The new DC UPS UPSI-2412DP2 from Bicker Elektronik, Donauwoerth/Germany, reliably protects safety-relevant 24VDC applications against system failure and data loss. -
Novotechnik Provides Compact Touchless Position Sensors
Novotechnik, U.S. has introduced the TFD Series of touchless linear position sensors to provide wear-free operation in tight spaces. -
Acromag’s Ethernet Expandable I/O Modules Earn Several Hazardous Locations Approvals
Ethernet remote I/O modules received UL, ATEX and IECEx approvals for use in Class 1 Div 2 or Zone 2 hazardous environments. -
LogRhythm Introduces Ground-Breaking, Cloud-Native Security Operations Platform
LogRhythm Axon’s intuitive analyst experience and enhancements to LogRhythm SIEM, NDR and UEBA empower security teams to detect and disarm cyberthreats. -
igus's Blue Laser Sintering Material for 3D Printing Ensures Even Greater Food Safety
The new iglide i6-BLUE laser sintering powder is highly abrasion-resistant, self-lubricating and food-safe, according to FDA and EU 10/2011 regulations. -
Rockwell Automation Increases VFD Output Frequency for High-speed Motor Applications
Rockwell Automation announces new enhancements to medium voltage PowerFlex 6000T variable frequency drives (VFDs). -
NUM Launches Linear Electric Motors Designed Specifically For Machine Tools
CNC specialist NUM has launched a series of brushless linear servo motors designed specifically for continuous duty cycle applications in machine tools. -
Maxon Motor Presents IDX Compact Drive with Integrated Positioning Controller
This compact brushless EC-i motor combined with an EPOS4 positioning controller delivers a highly dynamic, powerful drive package with field-oriented control, high efficiency and maintenance-free components in a high-quality industrial housing. -
MISUMI Announces Meviy, an On-demand Procurement Software
MISUMI, a global manufacturer and distributor of configurable components for industrial automation, announces meviy, a new on-demand procurement software. -
Rockwell Automation Simplifies Sizing, Selection of Motion Control Components with New FactoryTalk Motion Analyzer
The software enables users to select, analyze and validate their system components using new intuitive workflows and comparison tools. It is now available for download on the Rockwell Automation website. -
Rockwell Automation Expands Threat Detection Offering Through Managed Services
Rockwell Automation launched the new Threat Detection Managed Services offering in early 2022 providing customers with application-level, real-time monitoring, and response services to help detect, identify, contain, eradicate and recover from a cyber incident. -
Siemens' New Desigo CC V6 Building Management Platform Adds Native Cloud Connectivity
Siemens Smart Infrastructure has unveiled the latest version of Desigo CC, its integrated building management platform for the digitalization of buildings of any size. -
WAGO’s LEVER-LUTION Continues with New PCB Terminal Block
WAGO’s new 2601 Series is the first super-compact, tool-free PCB terminal block with lever technology, allowing quick and easy wiring for cross-sections from 26 to 14 AWG. -
CoreTechnologie's 3D Evolution Software Offers New Collision Analysis Tool
CoreTechnologie's 3D_Evolution analysis software accurately identifies collisions between components and helps to avoid costly changes and delays for machinery and plant engineering. -
Thomson Introduces Precision Ball Splines that Deliver Robust Rotary and Linear Motion Integration
Thomson Industries, Inc., a leading manufacturer of linear motion control solutions, has introduced a line of precision ball splines that enable robust delivery of rotary and linear motion on a single shaft. -
Siemens Launches Digital Service Portfolio for Fire Safety
The new Fire Safety Digital Services enable businesses to move from reactive to proactive fire safety. -
OleumTech Adds Smart DP Transmitter to H Series Instrumentation Platform
OleumTech, a leading provider of industrial automation and IoT solutions, announced the addition of a Smart Differential Pressure (DP) Transmitter to its H Series line of hardwired process instrumentation. -
JAI’s Newest Go-X Series Cameras Feature 5GBASE-T Interfaces
JAI has announced the launch of 12 more Go-X Series small machine vision cameras featuring GigE Vision interfaces operating at 5GBASE-T (5 GigE) speeds. -
ICI Debuts High-resolution Titan HD Infrared Camera for Industrial, Energy, Building and Scientific Application
This mew handheld camera pairs 1.3 megapixel resolution with an affordable price, offering an ideal solution for long-distance surveying of critical assets. -
ABB Expands ABB Ability Smart Sensor to General Machinery
The ABB Ability Smart Sensor is now available for industrial motors and general machinery, including pumps and fans. -
Kistler Launches SlimLine Force Sensor
Kistler has launched the new SlimLine force sensor 9132CD, a force transducer that is nine times more sensitive than comparable SlimLine sensors. -
Teledyne Introduces Contact Image Sensors for High-speed, High-resolution Line Scan Imaging
Teledyne DALSA is pleased to introduce AxCIS, a new family of high-speed and high-resolution fully integrated line scan imaging modules. -
POSITAL LINARIX Sensors: Rugged Linear Position Sensors with Optimized Accuracy
POSITAL LINARIX linear positions sensors have been updated with extra-heavy-duty draw-wire mechanisms and with a convenient pre-scaling option for devices with analog communications interfaces. -
HighByte Expands Industrial Connectivity from Microsoft Azure IoT Edge to Azure Digital Twins
The industrial software company has expanded cloud connectivity and improved enterprise IT management with HighByte Intelligence Hub version 2.5. -
Teledyne Announces Next Generation 5GigE Area Scan Camera Platform
The new Forge camera platform brings together Teledyne’s vision expertise and customer knowledge in a new camera family. -
NORD DRIVESYSTEMS Provides High Efficiency Automation Solutions for Airports and Baggage Handling Systems
The worldwide industry provider designs, engineers, and manufacturers highly configurable solutions for check-in, sorting, high-speed transport, baggage reclaim and more. -
Basler Announces Vision Compatibility for New NVIDIA Jetson Orin Nano Edge AI Platform
Basler will be introducing Add-on Camera Kits with 5 and 13 MP to support the NVIDIA Jetson Orin Nano system-on-modules (SOMs). -
Bosch Rexroth Expands Its Portfolio of Linear Robots for Various Applications in Factory Automation
Bosch Rexroth has expanded its portfolio of linear robots for various applications in factory automation by adding new axis combinations and sizes. -
EDAX Introduces Velocity Ultra, the Fastest EBSD Camera in the World
AMETEK EDAX, LLC, a leader in X-ray microanalysis and electron diffraction instrumentation, launched a new, faster, low-noise CMOS camera to its Velocity Electron Backscatter Diffraction (EBSD) Camera Series. -
Honeywell Launches First Integrated Aspirating Smoke Detection and Indoor Air Quality Monitoring System
Honeywell launched a first-of-its-kind solution that combines early warning smoke detection with advanced indoor air quality (IAQ) monitoring, furthering its efforts to create safer and healthier buildings. -
BitFlow to Reveal Its First CoaXPress-Over-Fiber Frame Grabber at VISION Trade Fair in Stuttgart
BitFlow Claxon Fiber CPXoF frame grabber extends CoaXPress's capabilities to help machine vision system integrators reach throughput targets. -
Conta-clip Presents Slim GSM Retrofit Module for SMS Fault Messaging
Many waterworks stations and agriculture applications use compact controllers for pump or ventilation systems, which are often installed in hard-to-reach or remote places. -
e-con Systems Launches GigE Low Light HDR Camera Based on Sony STARVIS IMX462
e-con Systems, a leading embedded camera company, launches RouteCAM_CU20, an HDR GigE ultra-low light camera with network synchronization capability. -
Baumüller Offers Newly-developed, Drive-based Solution
In addition to its cross-cutting library in the control unit, the drive and automation specialist Baumüller offers a newly developed drive-based solution for these applications. -
IAR Systems Fully Supports Renesas RZ/T2 & RZ/N2 Series MPUs for Real-Time Control & Industrial Networking
The innovative tools of IAR Embedded Workbench help accelerate the development of next-generation factory automation applications that require real-time performance, industrial networking and functional safety essential for high-performance motor control. -
Moxa Expands Marine-Grade Industrial Computer Family to Help System Integrators Respond Faster to Changing Networking Demands
Moxa announced a significant expansion of its marine-grade industrial computer line with the introduction of the MC-3201 Series designed to add higher processing power and scalability to maritime operations -
Beckhoff Redefines Cabinetless Automation with Plug-and-Produce MX-System
With pluggable IPC, I/O and drive technology modules from Beckhoff, the IP67-rated system delivers maximum space and time savings for machine builders and end users. -
Kollmorgen Debuts EKM Series Brushless AC Servo Motors
These enhanced, high-performance motors are MilSpec 810E rated and IP67 sealed. They are supplied standard with a stainless-steel shaft and chemical agent-resistant paint for reliable duty in harsh environmental conditions. -
NUM Launches Next-generation CNC Platform
Based on system-on-chip technology, the Real-Time Kernel hosts both the PLC and the CNC systems in one device. -
Novotechnik Introduces TFD Series of Touchless Linear Position Sensors
Novotechnik, U.S. introduces the TFD Series of touchless linear position sensors provide wear-free operation in tight spaces. Maximum sensor dimensions are 40 x 27 x 7 mm thin. -
OGP Launches New SmartScope E7 Multisensor Metrology System with IntelliCentric Optics
Optical Gaging Products is proud to announce the addition of SmartScope E7, the first in the all-new SmartScope E-Series family of 3D Multisensor Measurement Systems. -
Ava Robotics Reveals Latest Autonomous Security Robot at GSX in Partnership with Johnson Controls
Ava Robotics has unveiled the latest version of a security robot at the Global Security Exchange (GSX) Conference 2022 in Atlanta. -
Wachendorff Presents World's Most Compact Ethernet/IP Encoder
Wachendorff is expanding its range of Ethernet-based encoders: Encoders with the EtherNet/IP protocol are now available, including the most compact in the world: the WDGA58F. -
OGP Grows Multisensor CMM Lineup with New Large Format FlexPoint 12-Series
Optical Gaging Products, a world-leading manufacturer of optical and precision multisensor metrology systems for industrial quality control, announces the addition of the new FlexPoint 12-Series to its family of large format Multisensor Coordinate Measuring Machines. -
New Nokia Industrial 5G Fieldrouter to Extend Private Wireless Capabilities and Simplify Connectivity in North America
Using the new Nokia Connectivity Operations Dashboard customers can track and gain insight into network and device utilization and health for stakeholder reporting. -
Kaman Measuring ThreadChecker Sensors Automate Inspection for Automotive Manufacturing
Noncontact application-specific sensors provide rugged and reliable verification of thread presence and are available from stock and ready to ship. -
ABB Launches ABB Ability BeerMaker Intelligent Process Control Solution
The brewery-specific ABB Ability BeerMaker intelligent process control solution will support safety and quality improvements, boost productivity and raise operational efficiency. -
Cogniteam Ignites Robotics AI Capabilities with NVIDIA Jetson AGX Orin Edge AI and Robotics Platform
Cogniteam used the Jetson AGX Orin to enable AI on robots using the Nimbus Operating System. “The NVIDIA AGX Orin is a huge leap for manufacturers and developers who want to see greater AI capabilities on their edge robots,” said Dr. Yehuda Elmaliah, co-founder & CEO of Cogniteam. -
Teledyne e2v Releases Optimom 2M, Turnkey MIPI Optical Modules for Development of Vision Systems
Teledyne e2v announces the release of its 2-Megapixel Optimom, the first in a range of MIPI CSI-2 optical modules. -
Eplan Platform 2023 Streamlines and Accelerates Project Planning with Cloud-based Device Management
The new Eplan Platform 2023 combines a number of new features that make it easier to use and pay off in time savings and increased performance for users. -
Chromasens Introduces Line Scan Imaging System Optimized for Semiconductor Wafer Inspection
The system simultaneously acquires multiple illumination conditions in a single scan. -
igus Presents New i.Sense EC.B Cable Sensor for E-chains
Condition monitoring for chain lengths of over 35 meters is now possible with just one sensor. -
FANUC Boosts Machining and Programming Efficiency with New Digitalization Suit
NC Reflection Studio provides full machining simulation for verification and optimization of the G-code program, job setup and part production. -
Beckhoff Boosts XTS Movers’ Capabilities with No-Cable Technology
The wireless NCT delivers power and communication to end effectors, sensors and other tools installed directly on XTS movers. -
Basler Presents New 5GigE Product Range
The familiar small format, five times the speed, and compatibility of all hardware and software components are the core competencies of Basler's new 5GigE product range. -
iBASEt Transitions to ‘Cloud First’ Development Cycle with Launch of Solumina iSeries i070
The new solution features industry leading cyber security, including rigorous OWASP testing. -
Nord Drivesystems Releases MAXXDRIVE XD Industrial Gear Units Engineered for Crane and Hoist Applications
The new MAXXDRIVE XD series expands on NORD’s powerful MAXXDRIVE IGU offering with an extended center distance developed specifically for the demands of industrial cranes and hoists. -
Ametek Process Instruments Announces New Combustion Analyzer Maintenance Kits
AMETEK Process Instruments is introducing several new combustion maintenance kits for its WDG-V, WDG-IV and WDG-HPII analyzers. -
SVS-Vistek Introduces High-Resolution Ultraviolet Machine Vision Cameras
SVS-Vistek GmbH today introduced its new fxo487 series of ultraviolet cameras with a maximum frame rate of 194 frames-per-second (fps) and 8.1MP resolution (2840 x 2840).















































































































































![[eBook]: Single Pair Ethernet Easily Explained](/documents/d/acom/harting-featured-product-october-2022-web.png)


























































