Scroll down to search for more products...
Industry Products
Featured Products
-
Power CAD, Simulation & Digital Twins
Accelerate simulation, CAD, and digital twin workflows with the NVIDIA RTX PRO 6000 Blackwell Workstation Edition. Get powerful AI-enhanced performance, advanced visualization, and enterprise-ready capabilities for demanding projects. -
Precision Motion with Brother Servo Gearboxes
Compact, low-backlash servo gearboxes built to deliver precise motion, high torque density, and reliable automation performance. -
The Next Evolution in Process Control Is Here
DeltaV™ version 16.LTS Distributed Control System (DCS) builds on decades of field-proven innovation to deliver the most robust and reliable release yet. -
Connect Operations, Data, and Insights with GENESIS
Stop struggling with disconnected data. GENESIS unifies SCADA, visualization, historian, and analytics in one platform.
25,376 Products
-
Antaira introduces LNX-0500-M12-67 series Ethernet switches
The 5 port 10/100MB LAN M12 ports offer 148,800pps for fast packet switching with store and forward technology. The M12 4-pin D-coded, female connectors feature auto negotiation speeds, full/half duplex mode, and auto MDI/MDI-X connections. -
Omron Automation releases NX-series safety controller with CIP Safety support
This addition means that the controller supports two industrial safety networks – CIP Safety and Safety over EtherCAT (FSoE). The controller is optimized to support applications in industries like automotive manufacturing and food factories. -
Energid releases Actin 5 software development kit
The Actin SDK can be used with any type of industrial or collaborative robot or complex articulated mechanism in any type of application, including those in the industrial, medical, Oil & Gas, agricultural, and aerospace domains. -
Cincoze introduces P-1100 series of fanless embedded computer
P1100 series accommodates I/O interfaces, including 2x Intel GbE LAN, 4x USB 3.0, 4x COM, and 8x Isolated DIO. The system also supports three independent displays running simultaneously and enables 4K/2K playback via DisplayPort. -
Balluff introduces family of stainless steel fork sensors
The sensors feature normally open and normally closed outputs for integration into control systems. Multiple light sources — red light for setup or infrared light source for highly contaminated or environments with water or mist in the air — enables this sensor to be used in a multitude of applications. -
OnRobot introduces Robotics Tool Quick Changer
The Quick Changer releases end-of-arm tools with a click and inserted tools are automatically positioned correctly with a repeatability of ±0.02 mm. The Quick Changer can be used on any robot arm, drone, or other equipment with an ISO-9409-1 flange. -
AutomationDirect announces PS series fork sensors
PS series fork sensor additions include harsh duty U-frame sensors for food applications, L-frame or angled fork sensors for mounting situations, and fork sensors for liquid detection. -
SKF Motion Technologies introduces CASM-100 electromechanical actuators
Various modules providing choices among motor types, gearboxes, ball screws or roller screws, and accessories allow for custom combinations of components ideally suited for an application. -
Beckhoff announces TwinCAT IoT Communicator
The TwinCAT 3 IoT Communicator exchanges data using a publish/subscribe mechanism. Information is exchanged via a message broker that uses the standardized MQTT protocol and acts as a central messaging service in a cloud or local network. -
Littelfuse introduces LJ series of TRIAC
his combination of packaging, temperature capabilities and choice of current ratings makes them suited for Internet of Things (IoT) applications that require compact design but don’t involve continuous high currents such as smart doorbells, thermostats, ceiling fans/lights, door locks, etc. -
Antaira releases LNP-0800G-M12-67-24 Layer 2 unmanaged series switch
The switch offers 24 to 55VDC redundant power inputs through 4-pin M12 T-coded male connector. A total power of 180W is available for supplying up to eight IEEE 802.3af (PoE) & 802.3at (PoE+) devices. -
Optomec announces LENS 860 Hybrid Controlled Atmosphere (CA) System
The LENS 860 Hybrid CA system has an 860 x 600 x 610mm work envelope, is equipped with a hermetically-sealed build chamber that maintains oxygen and moisture levels below 10 ppm for processing reactive metals, such as Titanium. -
Sterling Systems & Controls announces Hand Prompt Batching Station
The Hand Prompt Batching Station serves a range of industrial applications where the negative effects of time consuming and problematic manual batching needs to be eliminated. -
Endress+Hauser releases Proline Promass A Coriolis mass flow meter
The Promass A sensor system is mounted on a base plate that acts as a “shock absorber,” effectively shielding the Coriolis measurement from outside interference, e.g. from pipe vibrations. -
Electromate introduces Tecnotion Torque motors
Manufactured in volume, these Tecnotion Torque motors feature encapsulated windings and include two types of thermistors as standard features. Tecnotion offers motor sizes from 68mm to 160 mm diameters, to date, these motors will work with any servo drives. -
IBASE announces MAI602-M4D80 motion control system
The MAI602-M4D80 motion control system can be used in various factory production applications such as automated optical inspection, semiconductor wafer handling, packaging and material handling systems. -
Siemens releases Siship BlueDrive Eco green propulsion system
With its Siship BlueDrive, Siemens provides an environmentally friendly propulsion solution with emissions down as low as zero depending on the drive configuration. -
Delta Industrial Power Supplies introduces MEG-2K1A6 configurable power supply
The MEG series come with universal AC input from 90Vac to 264Vac and wide operating temperature of -20°C to +70°C (with full power up to 50°C). -
NK Technologies releases AGT-FD Series ground fault sensors
The AGT's sensing window is large enough to monitor 100 amp circuits. It can also be used to measure and monitor any low-value AC circuit current by passing just one of the conductors through the sensing window. -
Inspekto announces Autonomous Machine Vision QA solution
Plug & Inspect powered systems provide full autonomy to the manufacturing plant: systems immediately self-adapt to any changes in the inspected object environment, such as changes in light conditions and object location or orientation. -
Calex announces 48S14.250BC Bi-Directional DC/DC converter
The Bi-Directional DC/DC converter charges a low side (12V) battery during normal operation (buck mode) and charges or assists the high voltage (48V) battery in emergency situations (boost mode). It is packaged in an 9.45” x 5.366” x 0.725” mechanically enclosed package weighing 2.86 lbs. -
Enerpac announces ZC-Series cordless hydraulic pump
The pumps are suited for use in industrial applications such as foundation repair, rail maintenance and concrete post-tensioning. -
Thermon announces TraceNet Genesis Control & Monitoring System
The TraceNet Genesis System gives access to comprehensive heat trace circuit information, including circuit performance history, fault analysis, and circuit drawings. Using this information, maintenance personnel can predict failures. -
New Scale Robotics introduces NSR-PG-10-20 Precision Parallel Gripper
The NSR-PG-10-20 Precision Parallel Gripper is a smart gripper available for collaborative robots, including the UR3, UR5 and UR10 robots from Universal Robots (UR). -
Nexen Group introduces Motor Ready Sealed (MRS) precision rotary indexer
For high load applications, the customer can drive the system with a reducer/motor combination. Additionally, the gear-to-pinion reaction loads are fully supported so the servo motor shaft is not subjected to radial loading. -
Peratech introduces distributed force array (DFA) sensor
The distributed force array (DFA) sensor uses Peratech’s quantum tunnelling composite (QTC) technology to provide an array of single point sensors that can be used in conjunction with a position sensor (such as capacitive) to measure force and correlate it with position. -
EVT announces EyCheck 4000 Z series of smart line scan camera
All EyeCheck 4000 Z cameras have a FPGA, DualCore ARM processor as well as a GigE interface with Power over Ethernet (PoE). The user also gets the IP core for using the FPGA. And in addition to the EyeVision library the cameras support also other libraries such as OpenCV. -
ANCA Motion introduces LinX M-series linear motor
The LinX M-Series is fully compatible with standard pneumatics accessories such as mounting plates, linear guides and couplings. -
FCI introduces FS10i flow switch monitor for machinery manufacturers
The measurement of compressed air flow lines with the FS10i Switch/Monitor can provide information to the equipment’s control system in order to optimize the air flow. -
Binder USA releases Series 696 HEC (Harsh Environment Connector)
The 32 A per contact, 600 V power connector is constructed with 4+PE, 8 and 12 silver-plated crimp contacts. -
Siemens releases RST2228P Ethernet 19 inch rack switch with Power-over-Ethernet support
The RST2228P offers Power-over-Ethernet, precision timing and network communication on a single network. -
GAM releases GPL zero-backlash planetary gearboxes
The GPL series is available in seven sizes with ratios from 36:1 to 200:1. Output options for the GPL series include a solid flanged output (GPL-F) and a hollow shaft flanged output (GPL-H). -
Balluff introduces family of flat pack photoelectric sensors
The sensors, which include a stainless-steel housing, are resistant to aggressive cleaning agents, chemicals, coolants or other media and meet the requirements for packaging, food & beverage industries. -
Hexagon introduces portable Absolute Arm range
This Absolute Arm range retains many features of the previous generation of ROMER Absolute Arm. These include the proprietary Absolute Encoders and diagnostic reporting, as well as rotating grips and a counterweight system that facilitate movement and measurement. -
IDEC announces BACnet/IP support for MicroSmart FC6A Plus PLCs
This open protocol has been standardized under the ANSI/ASHRAE 135-2012 specification for interoperability among systems built by different manufacturers. -
AutomationDirect introduces Fuji TK26E Series Thermal Overload Relays
The relays can be manually tripped and a trip-free mechanism is also provided. Mounting base units (TZ1H26E) can be added to enable separate mounting of the relays. -
Pepperl+Fuchs announces introduces PXV 2-D absolute positioning system
The reading window of the PXV has been enlarged to approx. 120 x 80 mm, meaning that the Data Matrix code tape is always located within the sending range. -
CAS Dataloggers announces ProfiSignal Web Software package
Whether for monitoring ongoing testing process, fault analysis, condition or temperature monitoring or energy monitoring, PS Web provides a solution for measurement and testing. -
Axiomtek introduces SDM300S smart display module
Whether externally plugged in to a display or built in, the smart display module is optimized for digital signage, interactive kiosks, point of sale (POS) and video walls. -
Measurement Computing Corporation releases MCC 118 voltage measurement DAQ HAT for Raspberry Pi
The MCC 118 provides eight single-ended analog inputs with sample rates up to 100 kS/s for taking single point or waveform voltage measurements. -
Pixelink announces 5.1 megapixel polarization camera
The machine vision camera will offer broader visual detection and characterization capabilities of material properties as well as improved performance over conventional monochrome sensors. -
FCI announces ST75 Series Air/Gas Flow Meter for gas dosing, injection measurement
It can be calibrated to measure gases over a flow range from 0.04 to 559 SCFM (0.07 to 950 NCMH), depending on line size, which is useful in low-flow applications requiring small doses. -
Larson Electronics releases EPCS-PBS-2PS.OF-PTM.PLG-24VAC explosion proof control station
This hazardous location control station is constructed of sturdy aluminum with stainless steel parts for additional reliability. The station is NEMA 7 (C, D) and NEMA 9 (E, F, G) rated, and includes three pre-drilled and tapped operator holes with ¾-inch NPT hubs. -
Rockwell Automation announces Allen-Bradley GuardShield 450L safety light curtain system
The Integrated Laser Alignment System (ILAS) of the GuardShield 450L-E provides multiple visible laser points that optimize setup with a touch of the ILAS symbol on the front window of the stick. -
Bachmann releases M-Target for Simulink Version 2.20
Using the MATLAB console or scripts it is possible to read online values directly from the control system and make them available for further calculations and evaluations -
AutomationDirect introduces igus Chainflex continuous flexing CF30 and CF31 motor supply cables
The cables are available with four unshielded (CF30 series) or four shielded (CF31 series) conductors in 16 AWG to 2 AWG sizes. Individual conductors are bare copper and stranded for flexing applications. -
Altech introduces SMART Non-Contact Safety Sensor SRF
Sensors are available with diagnostics function that can be monitored with I/O Link supporting Industry 4.0 implementation and Smart Factory operations. -
Advanced Micro Controls announces SMD E2 series of stepper motor controllers
AMCI’s SMD E2 Series units come standard with EtherNet/IP, Modbus-TCP, and Profinet built in. The integrated web server facilitates simple network type selection and IP address configuration. -
ATEK Access Technologies announces Datakey Read-Only DFX PC Adapter
The adapter is the latest addition to the DFX RUGGEDrive Series of Secure Digital (SD) memory devices. It works to prevent accidental deletion or modification of recorded data without the need for a read/write switch. -
Vision Components introduces VCnano3D-Z-series embedded vision systems
The VCnano3D-Z-series embedded vision systems are designed for use in OEM applications. They contain a Xilinx Zynq SoC, which comprises a dual-core ARM processor and an FPGA. -
Novotechnik introduces Vert-X 2800 Series of angular measurement sensors
The J1939 CAN bus option enables peer-to-peer or broadcast signaling and is a standard often found in commercial vehicle applications. J1939 is a software protocol associated with CAN bus and provides serial data communications between microprocessor systems connected through the bus. -
Hexagon Manufacturing Intelligence announces Optiv Performance 322 coordinate measuring machine
Weighing under 400 lbs, the fixed bridge and moving table-type machine is light enough to be placed directly on existing workbenches and relocated without recalibration by a Hexagon engineer. -
Delta Electronics announces DRP-24V240W1CAN and DRP-24V480W1CAN DIN rail power supplies
The intelligent overload protection in constant current mode makes the power supply suitable for battery charging applications -
HMS Industrial Networks announces Flexy edge gateway with support for OSIsoft PI System
The Flexy edge gateway is designed to simplify the process of extracting real-time data from machines using serial and Ethernet communications protocols by offering I/O drivers for PLC manufacturers including Siemens, Allen Bradly, Mitsubishi, ABB and others. -
Larson Electronics releases EXP-MS-N4X-AT-HV-12.4-15M explosion proof motion sensor
This sensor features microwave sensors, which are known for high performance in unstable climates. The sensors send out waves, which are reflected by surrounding walls and objects. -
Mitsubishi Electric Automation introduces Pak/iQ portfolio of packaging products
Mitsubishi Electric’s portfolio of products and solutions include pre-configured diagnostic and maintenance screens, pre-configured operator screens and a pre-engineered application code library for designs. Pak/iQ is intended for bottling, pillowing and wrapping machines. -
Kinitics Automation announces KPP05 Piston Pump
Driven by the company’s KLA05 Linear Actuator, the product requires AC or DC electrical power to operate, and allows for displacement or pressure control when additional sensors are used. -
Phoenix Contact introduces RAD-900-DAIO6 900 MHz spread-spectrum transceiver
This device can monitor digital on/off status, actuate relay outputs, and transmit or receive 4–20 mA signals over distances up to 20 miles. The I/O signals can be mirrored at other stations in the wireless network or mapped to Modbus RTU for integration into a Modbus host system. -
TRACO POWER releases TPP 450-M series of industrial approved 450 watt power supplies
Ruggedized to meet IEC 60068-2-6 (Vibration), IEC 60068-2-27 (Shock), MIL-STD-810F (Thermal Shock) and UL 62368-1 approved extends the application base of these power supplies into industrial markets. -
Thorlabs announces MEMS‐VCSEL Swept‐Wavelength Laser Sources
Based on a patented microelectromechanical system (MEMS) tunable vertical cavity surface emitting laser (VCSEL), these light sources include an active power control that maintains constant output power over the lifetime of the laser. -
Optimal Engineering Systems releases AT20-300 Motorized Vertical Lift Stage
Applications for the AT20-300 Motorized Vertical Lift Stage include: Positioning of Flasks, stirrers, hotplates, and other lab equipment, testing, inspection, assembly, sampling, laser drilling and machining in a broad range of industrial, medical, semiconductor, and research applications. -
ABM Greiffenberger introduces unit sizes 80 and 100 of SINOCHRON Motors
The drives operateat ambient temperatures from –30 °C to +60 °C. Torque fluctuations are minimal thanks to the special rotor design. This provides for torque synchronisation and a low noise level. -
ATEN Technology announces 4-port USB Boundless KM Switch
The Boundless Switching function supports extended desktops with up to eight monitors when two switches are daisy-chained, speeding up switching between computers. -
NORD releases NSD TUPH surface conversion system
NORD’s NSD TUPH surface conversion system is designed for many food and beverage industry applications, where drive technology is exposed to extreme ambient conditions and highly corrosive environments. -
TRU-Vu releases SXOBH-43-XTR Sunlight Readable monitor
The 43” screen features 1920 x 1080 full HD resolution and over 2,500 nits of brightness. =5mm Anti-Reflective, impact-resistant safety glass (rated IK10) protects the screen from damage. -
Moticont introduces the HVCM-051-025-019-01 moving coil linear motor
The HVCM-051-025-019-01 hollow core voice coil linear motor has an open apertures of 0.750 in. (19.05 mm). The hollow core allows for optics, illumination, laser beams, or cables to pass through. -
Aircuity announces enhancements to Aircuity 2.0’s MyAircuity web app
This most recent release also included both features and enhancements made to the Aircuity Engineering Tool; the proprietary software used by engineers to design the Aircuity system. -
ABB introduces IRB 14050 single-arm YuMi collaborative robot
Weighing less than 10kg, and capable of being mounted from a ceiling, table and wall, this addition to the YuMi family offers increased flexibility to help meet high-mix, low volume production in short cycles. -
Zero-Max introduces Zero-Max Crown Right Angle Gear Drives
Zero-Max Crown drives feature heat treated AGMA Class 10 spiral bevel gears. This combination of bearing design and lubrication formulation ensures maintenance free operation for industrial applications. -
AAEON introduces EPIC-KBS9 4” SBC
The EPIC-KBS9, a 4” SBC is built to accommodate 65W Intel Core i socket-type processors. Fitted with these CPUs, the board is designed for data encryption, video streaming, and advanced machine vision applications. -
Axiomtek releases MMB501 Micro ATX motherboard
The MMB501 is suited for integration into gaming, entertainment, POS/kiosk, surveillance, industrial automation and many more applications. -
Saki Corporation introduces Saki Self-Programming Software for automated optical inspection (AOI) equipment
Saki Self-Programming is a system that doesn't require DFM software. It combines technology that captures complete height and XY data and images while simultaneously scanning multiple fields of view. -
EXAIR releases Soft Grip Super Air Scraper
This product is intended for the removal of caulk, sealant, adhesives, tape, paint, stickers, labels, grease, lubricant and difficult to sweep metal chips, flakes or discs. -
L-com introduces right-angle Ethernet cable assemblies
These cables feature a specialized channel separator and load bar to achieve true Cat5e performance while maintaining a right-angle bend and are fully shielded to limit EMI and RFI interference. -
AutomationDirect announces Socomec DIRIS A power meters
With a backlit screen, these power meters display key power system values, and direct access keys (four to six depending on the model) are used to access functions required for energy efficiency projects and electrical distribution monitoring. -
Larson Electronics announces HAL-CMR-IP-POE-PTZ-20MP hazardous location camera
The HAL-CMR-IP-POE-PTZ-20MP produces 1080p full-HD high resolution images day and night, for both indoor and outdoor applications. This explosion proof camera is capable of capturing images 1920 x 1080 resolutions. -
Process Sensors Corporation introduces PSC-PMB-SOLO non-contact infrared temperature sensors
Analog and relay outputs are available via separate DIN rail mounted modules with use of an optional PSC-PM180 touch screen display. Configurable parameters include emissivity settings, response time and averaging via a PLC or optional touch screen display. -
ASM introduces posirot PMIS4/PMIR7 incremental encoder solution
The measuring system posirot PMIS4/PMIR7 consists of a sensor head PMIS4 and a magnetic ring PMIR7 with magnetic index marking. The sensor head is made of metal and is fully enclosed on all sides. -
IBASE introduces OFP series open-frame panel PC
The OFP series features a single-unit solution combining a flat touch screen display with embedded computer for industrial and commercial applications. -
KASTO introduces KASTOmiwin range of double mitre bandsaw
Initially available as the semiautomatic KASTOmiwin U 4.6 and the automatic A 4.6 version, it is designed particularly for cut-to-size pieces in the steel industry, the iron and steel trade, plant construction and special machine building. -
Miki-Pulley announces BXR-LE series of electric spring applied brakes
With accompanying voltage controller, the brake’s power consumption is stepped down to 7VDC after a split second of 24VDC for brake actuation. -
Additive Innovation introduces Partfinder software for 3D printing
The "Partfinder" software analyzes 3D CAD data geometrically as well as on the basis of the construction history, PMI and metadata. The information thus obtained is stored in a database. -
Applied Motion Products introduces STF Stepper Drives
These stepper drives consolidate motion control functions into the application software of the primary logic or machine controller, rather than in individual axes. -
e-con Systems releases eSOMiMX6PLUS System-on module
This System-On-Module encompasses eMMC Flash whose capacity ranges from 4GB to 64GB and 64-bit DDR3 with capacity as low as 256MB to as high as 4GBytes -
AutomationDirect introduces Socomec SIRCOVER UL 1008 rated manual transfer switches
SIRCOVER manual transfer switches have three stable, completely isolated positions and feature 2, 3 and 4-pole configurations; 100A, 260A and 400A ratings, with 240VAC and 600VAC max operation voltage (AC) ratings. -
H2W introduces LMAA-04-01 linear induction motor
A non-contacting linear motor measuring 8.7 in. [223 mm] long x 3.0 in. [75 mm] wide x 1.7 in. [43 mm] high this LIM operates on the same principal as a rotary, squirrel cage, induction motor. -
Axiomtek introduces GOT315WL-845 panel PC
This touch panel PC has a 15.6" WXGA TFT widescreen LCD display with a projected capacitive touchscreen and 400 nits brightness. It is capable of displaying contents in HD resolution (1366 x 768), making it suitable for human machine interfaces, infotainment and self-service kiosks. -
Sterling Systems & Controls announces Automated Bulk Bag Filling solution
This automation and process control system includes a Motor Starter Process Control Panel. Included in this control panel is an Allen Bradley PLC with discrete and analog outputs, an Allen Bradley Panel View Plus 10” color touchscreen, and custom automation software to meet the application requirements. -
Electromate releases GAM GPL-V (shaft) and GPL-H (hollow) planetary gearboxes
The GPL-V (shaft) and GPL-H (hollow) have a backlash of ≤0.1 arc minute and are planetary gearboxes for horizontal and vertical robotic applications. Tilting rigidity results in positioning accuracy with a rated 20,000 hours. -
Emerson introduces HART 7 position transmitter for TopWorx D-Series switchbox
The HART 7 position transmitter’s LCD display and navigation buttons permit local 5-point calibration for setup on linear applications. Diagnostic capabilities include measurements such as percent valve is open/closed, open and close dwell time, valve transition time – from open to close, and last open/close stroke time. -
E-T-A Circuit Breakers releases REX12D-T Electronic Protection System
The REX12D-T circuit protector, in combination with the EM12D-TMB supply module that communicates via Modbus-RTU protocol, is intended for those looking to incorporate condition monitoring and predictive maintenance into their systems. -
Microchip Technology introduces CryptoAutomotive In-Vehicle Network (IVN) TrustAnchor/Border Security Device
The CryptoAutomotive TA/BSD development kit emulates a secure node in an automotive network and provides system designers with a starting point for implementing security. -
Balluff introduces BOS 21M ADCAP photoelectric sensor
The all-rounder uses red light and lets users choose from among four sensor modes: background suppression, energetic diffuse, retroreflective or through-beam sensor. All the sensor functions can be configured over IO-Link while the system is running, so that a remote teach-in can be initiated by the controller. -
Fluke introduces 3561 FC Vibration Sensor
With a frequency range of 10 to 1,000 hertz, the 3561 FC detects and notifies users of conditional changes caused by critical faults like imbalance, misalignment, looseness and bearing wear, providing warning of impending equipment failure. -
Antaira announces IMC-C100-XX series industrial Ethernet-to-fiber media converter
There are Multi-Mode and Single-Mode models to support applications with a variety of fiber distances and types. It is designed to fulfill industrial applications that require fiber optic distance extension while using minimal space. -
Phoenix Contact introduces TMC 7 series of circuit breakers
The trip-free design eliminates closing the circuit during an overcurrent event. The device also isolates problems in the system while allowing for continued operation. The series complements the TMC 8 series of UL 489 circuit breakers. -
KeyedIn announces version 5.06 of KeyedIn Manufacturing for Enterprise Resource Planning
KeyedIn Manufacturing for Enterprise Resource Planning (ERP), focused on delivering increased functionality for custom, make-to-order manufacturers, now allows them to streamline front-office manufacturing management processes. -
Thomson Industries releases Thomson MLA stepper motor linear actuators
The Thomson MLA is suited for force-sensitive applications requiring shorter strokes that must be repeated with precision. Examples include adjusting a microscope slide stage, tilting a computer monitor or vertically positioning a pipette onto a test tube array. -
L-com introduces USB 3.0 Cables with Ferrites and LSZH Cable Jackets
L-com offers two versions of these assemblies. One version features USB 3.0 Type-A male to Type-A male connectors and the other version features USB 3.0 Type-A male to Type-B male connectors. -
Schneider Electric releases EcoStruxure Foxboro DCS Control Software 7.1
The EcoStruxure Foxboro DCS is an open, interoperable and future-proof process automation system that is designed to provide control over a manufacturing plant’s operational profitability. -
HARTING announces three MICA IIoT starter kits
The first is the HARTING MICA CISS Complete IIoT Starter Kit for a basic condition-monitoring application. The HARTING MICA RF-R300 Complete RFID Starter Kit contains everything needed for a basic RFID asset tracking application. The third kit is the HARTING MICA Basic Ethernet Starter Kit. -
EdgeTech Instruments introduces AcuDew two wire, loop powered aluminum oxide moisture transmitter
The AcuDew is available with several optional display modules. It has a loop powered, local, plug-in dew/frost point module, the AD-LPD. This module plugs into the cable connector of the AcuDew for a truly local display. -
Telchemy releases Embiot embedded analytics application for IoT devices
Telchemy has field experience in Edge Analytics with an installed base in excess of 300 million agents that provide analytics for real time services. -
PCB Piezotronics releases USB digital accelerometer
Model 633A01 is a piezoelectric accelerometer with integrated internal digital data processing for USB plug-and-play capability as well as data collection and sharing -
Pepperl+Fuchs announces PXV 2-D absolute positioning system
The reading window of the PXV has been enlarged to approx. 120 x 80 mm, meaning that the Data Matrix code tape is always located within the sending range -
Microchip Technology introduces IS2064GM-0L3 Bluetooth 5-compliant System-on-Chip
The IS2064GM-0L3 SoC makes the LDAC codec available to the market of audio product vendors, and it also allows customers to utilise Microchip’s technical support and development environment to assist customers -
Larson Electronics releases IND-AT-120.277-4CT-SPDT-4KE-N3R industrial astronomic timer
This timer features astronomic programming which allows sunset/On and sunrise/Off configurations. Also included with this unit are adjustable pulse features for contractor and bell ringing applications. -
Balluff introduces IODD web server for IO-Link device integration
The web server uses IODD (IO-Link Device Description) files that come with each IO-Link device to display, edit and update device parameters in human readable language. -
TRACO POWER introduces TEL10WI series of 10 watt DC/DC converters
hese DC/DC converters are enclosed in a 6-sided shielded metal case with an insulated base plate, an internal filter to meet EN 55032 class A conducted emissions or class B with external components and short circuit / overload protection circuits. -
Bodine Electric introduces 22B4-60P planetary gearmotor
The Bodine 22B brushless DC motor delivers operation with low electromagnetic-interference (EMI). It is encoder-compatible with the optional screw-in encoder shaft kit. -
Bodine Electric introduces 22B4-60P planetary gearmotor
The Bodine 22B brushless DC motor delivers operation with low electromagnetic-interference (EMI). It is encoder-compatible with the optional screw-in encoder shaft kit. -
Bronkhurst releases EL-FLOW Prestige mass flow controller with on-board pressure sensor
The Multi Gas / Multi Range functionality of the EL-FLOW Prestige enables the user to select any of the installed gases and to adjust the measuring range within the boundaries of the device. -
Yxlon introduces YXLON CTScan 3 line detector
Production is now machine-supported with the CTScan 3, resulting in crystal uniformity. Due to the range and signal stability, material thicknesses can be tested with the same X-ray energy. The solid housing is particularly resistant to temperature fluctuations, for cooling of the electronics. -
D3 Engineering introduces DesignCore D3RCM camera modules
Industrial vision applications include unattended surveillance systems, process automation, and machine vision. -
Eaton releases Bussmann series Compact Circuit Protector (CCP)
The Bussmann series Compact Circuit Protector (CCP) is a fused disconnect that features through-the-door operation and a multi-wire lug kit for application versatility while continuing to provide up to a 200 kA short-circuit current rating (SCCR), for industrial control panels, machinery and HVAC applications. -
Real Time Automation introduces 460ETCWI-N2E web interface
The 460ETCWI-N2E helps users to monitor ControlLogix PLC data from Excel or pull table values into any industry-standard web client application. -
Electro-Chemical Devices announces S80-T80 Cyanide Analyzer Monitoring System
This ECD CN Analyzer solution helps plants achieve a cyanide removal water treatment system, which ensures wastewater is treated to meet U.S. EPA regulatory requirements prior to effluent discharge. -
Kyntronics introduces SMART hydraulic actuator
Kyntronics SHA is fully engineered as a standard modular product. The system can be oriented in any position..This solution is powered by a servo motor that drives a hydraulic pump which generates pressure to act on a cylinder to provide mechanical actuation force. -
ControlAir announces Type-3600 stainless steel, high pressure regulator
The Type-3600 is designed to safely reduce inlet pressures from as high as 6000 psig (413 bar) down to working pressures ranging between 0 and 225 psig (15.5 bar). -
Future Design Controls introduces MCT4 ¼ DIN multi-loop controller
The MCT4 will provide control for applications in various markets including semiconductor, automotive, heat treating, packaging, food & beverage, chemical, HVAC, laboratory, etc. where control, monitoring and/or data logging is required. -
Antaira introduces IMP-C100-XX series Ethernet-to-fiber PoE+ media converter
Antaira Technologies’ IMP-C100-XX series is an industrial Ethernet-to-fiber PoE+ media converter featuring a 10/100TX Ethernet port and a fixed fiber interface which supports ST or SC connectors depending on the model. -
congatec announces conga-SMX8 Computer-on-Module
The SMARC 2.0 modules with NXP i.MX8 processors, hardware based virtualization and resource partitioning are designed for a range of stationary and mobile industrial applications including real-time robotics and motion controls. -
Tripwire announces Tripwire Data Collector cybersecurity solution
Tripwire Data Collector provides visibility of cyber risk through its ability to harvest asset data using native industrial protocols, standard IT protocols, and integrations with intermediary software applications -
Hexagon Manufacturing Intelligence announces PC-DMIS 2018 R2
This is the second of two releases scheduled for PC-DMIS in 2018, with continued service pack updates. Additions within PC-DMIS include a 2D Radius Gauge for quick checks on the go, added MoveInspect XR8 support, QuickFixture workflow with snap-to-grid capability, NX 12 DCI and Catia v5 R27 DCI & DCT support, -
Servo2Go introduces MPC power-off brake module for NEMA 17 & NEMA 23 Servo and Step Motors
This brake is designed to decelerate or hold an inertial load when the voltage is turned off. When voltage is applied, the friction disc is released and the brake is free of torque. -
Microchip Technology releases MCP39F511A power monitoring IC
The device provides standard power calculations such as active, reactive and apparent power, active and reactive energy, root-mean-square (RMS) current and voltage, line frequency and power factor, which enable designers to add power monitoring functions to end applications. -
Alliance Sensors Group releases LAS-19-A series spring-loaded AC-LVDTs
LAS-19-A AC-LVDTs are designed for use in power generation facilities and industrial automation equipment, and in many OEM position sensing applications. -
Pentek announces Talon RTX 25xx series recorder product line
Designed to operate from -40ºC to +60ºC, these recorders can handle most thermal environments, making them suited for UAV’s, aircraft pods, tight equipment bays, military vehicles and most outdoor environments. -
ABB introduces ABB Ability Smart Sensor for low voltage motors
The sensor collects data including: various types of vibration, bearing health, cooling efficiency, airgap eccentricity, rotor winding health, skin temperature, energy consumption, loading, operating hours, number of starts and RPM speed. -
Hilscher announces netX 90 dual processor chip
The chip addresses the fact that a large proportion of slave devices in use today will have to be replaced and/or updated if cyber risk threats are to be countered adequately for cloud-based and Industrial Internet of Things (IIoT) applications. -
Pfannenberg releases PKS Series Air to Air Heat Exchangers
This air to air technology takes advantage of a cooler ambient environment especially in harsh (dusty, oily, dirty) conditions when closed-loop cooling is required. -
Balluff introduces ceramic caps for sensors
The ceramic caps provide end protection for flush-mount and cylindrical-style inductive proximity sensors. The caps can simply be threaded in place to protect the most vulnerable area of a cylindrical bodied sensor. -
EVT introduces RazerCam LS smart line scan camera
Applications for the RazerCam Z or the EyeCheck 4700L are for example when products or components are transported on conveyor belts. Typical branches are e.g. print, sorting and packaging, food industry as well as all kinds of surface inspections. -
Hatebur introduces HOTmatic AMP 20 N cam lobe manufacturing machine
To date, most of the forged cam lobes are produced on the two Hatebur machines HOTmatic AMP 30 S und 20 S. The machine has a total press load of 1500 kN. The machine body has been reinforced for stability. -
E+E Elektronik introduces EE1900 humidity module
With temperature compensation across the working range from -70 °C to 180 °C (-94 °F to 356 °F) and the choice of stainless steel and plastic probes, the module is suitable for a range of applications. -
Micro-Epsilon introduces eddyNCDT 3060 inductive measurement system
The eddyNCDT 3060 is an eddy current measuring system for displacement measurements. With more than 400 compatible sensor models and smart signal processing, the eddyNCDT 3060 is designed for inductive displacement measurement. -
Advantech announces PWS-872 10” tablet
Built-in Wi-Fi, NFC, 3G/4G LTE, and Bluetooth 4.1 technologies provide connectivity for data acquisition, transmissions, over-the-air (OTA) updates, and real-time communication with backend systems. -
SNC Manufacturing introduces 18-pulse autotransformer and Gen II industrial control transformer
Both products will be released September 1. Offered in a complete range of input and output voltages (600-volt class and below), the units are UL, cUL and CSA listed with CE agency approval available. -
Somic America announces SOMIC-FLEX III packaging machine
The patent-pending SOMIC-FLEX III addresses requests from retail chains in the North American market looking for upright, two-part cardboard packaging. A manufacturer for end-of-line packaging technology, Somic is known for its design and development capability. -
Axiomtek introduces P1177E-500 industrial-grade touch panel PC
The P1177E-500 offers multiple CPU options with the LGA1151 socket 7th/6th generation Intel Core i7/i5/i3, Celeron or Pentium processors and the Intel H110 chipset. -
Honeywell announces Process Safety Suite
The safety solution integrates aeSolutions’ aeShield process safety software with Honeywell’s Safety Builder, Process Safety Analyzer and Trace solutions. -
Korenix announces JetCon 3701G industrial Gigabit PoE Ethernet media converter
JetCon 3701 is designed with IEEE 802.3af / IEEE 802.3at compliance and also has a metal case and IP-31 protection. It supplies single power input, the functionality of real time redundant power backup results in a real Industrial Gigabit Ethernet Media Converter -
Sequent Microsystems announces MegaIO-IND industrial automation card for Raspberry Pi
Loaded with inputs, outputs, and relays, the card will be designed for the Industrial Automation market. According to the KS page, the card attempts to integrate as many Industrial Automation functions as possible into the format of the Raspberry Pi. -
H2W Technologies introduces LMAA-04-01 linear induction motor
A LIM is a non-contacting, linear motor that operates on the same principal as a rotary, squirrel cage, induction motor. They are used in applications that do not require positioning. -
AW-LAKE and KEM Küppers announce TCM Classic, TCM Pro flow meters and TCD 9000 Series transmitters
The TCM “CLASSIC” Series meets general industrial requirements out of the box while the TCMP "PRO” Series offers units with performance specifications and diagnostic capabilities for operation in challenging environments. -
COPA-DATA announces BACnet certification for zenon automation software
Entry onto the international list of products conforming with the standard and receipt of the BTL certificate affirm the reliable communication between zenon and other systems and devices in building automation. -
ABB announces LMS200 magnetic level gauge switch
When mounted on an ABB KM26 magnetic liquid level gauge, or any other magnetic level gauges that contain a magnetic float, the LMS200 switch can sense high or low levels within a vessel. The magnetic coupling action avoids the need for seals, diaphragms, springs, or torque tubes. -
Nordson ASYMTEK announces combined conformal automated coating inspection (ACI) line
The automated coating inspection (ACI) line combines the Select Coat SL-940 Conformal Coating system with the FX-940UV Series ACI/AOI Automated Conformal Coat Inspection system. Together, the systems ensure a conformal coating process. -
Unitronics announces line of Variable Frequency Drives
The addition of a VFD product line is designed to simplify workflow by enabling customers to obtain VFDs, PLCs, and HMIs from a single supplier, program them all in a single software, and receive support from the same team throughout a project. -
Rockwell Automation introduces Allen-Bradley ControlTower 856T 70 mm Tower Light system
The ControlTower 856T is capable of accommodating up to seven modules in the same stack, offering users the ability to monitor more machine and process conditions in a single device. -
SICK introduces TDC-E Telematic Data Collector
The TDC gateway systems from SICK are used to collect, analyze, store, and transmit sensor data in mobile and stationary applications -
Endress+Hauser introduces Memosens CCS50D chlorine dioxide sensor
Endress+Hauser designed the Memosens CCS50D chlorine dioxide sensor to achieve a safe and efficient disinfection by providing stable measured values. -
Axiomtek introduces eBOX800-511-FL fanless embedded system
The eBOX800-511-FL is designed for an operating temperature from -30°C to 60°C, operating shock tolerance up to 3G and 9-36V wide range DC input. -
Balluff introduces safety light curtains with IO-Link connectivity
Users can choose from finger, hand or body detection versions, covering protective heights from 150mm (6 inches) to 1800 mm (71 inches). These safety light curtains meet the levels of safety required by EN ISO 13849 (PLe) and IEC/EN 61508/62061 (SIL 3). -
Emerson announces Roxar RMS 11 reservoir characterization software
Emerson’s Roxar RMS reservoir modeling software is a geosciences and reservoir engineering platform for seismic interpretation, well log interpretation and correlation, mapping, geomodeling, gridding and flow simulation. -
KUNBUS announces RevPi Connect IIoT gateway
Designed as an IIoT gateway for machine and plant engineering, the device has two Ethernet interfaces, a hardware watchdog and the possibility to connect various radio modules. -
Universal Robots announces UR3e, UR5e and UR10e robot arms
With a built-in, tool-centric force/torque sensor, the e-Series is ready to take on collaborative robot applications that require force control such as sanding, buffing, polishing and deburring where force-feedback is paramount in order to obtain uniform results. -
Nanotec announces LGA28 and LGA42 series of linear actuators
The linear actuators offer a integrated linear guide with movable polygon profile, feeding is possible without additional mechanical components. -
IBASE introduces IBR115 2.5-inch SBC and the IBR117 3.5-inch SBC
IBR115 and IBR117 are scalable SBCs with extended operating temperature support of -40°C to 85°C and an optional heatsink. Supporting 1GB DDR3 memory on board, the boards provide a number of interfaces for HDMI and single LVDS display interface, 4GB eMMC, Micro SD, COM, GPIO, USB, USB-OTG, Gigabit Ethernet and a M.2 Key-E interface. -
FLIR announces FLIR ONE Pro LT
All FLIR One Pro models feature FLIR’s MSX and VividIR video signal processing technology to deliver thermal image quality. -
Electromate announces Gam VP Series Performance Plus miniature spiral bevel gearboxes
The miniature VP Series is designed for miniature automation applications, such as medical and semiconductor. The housings are manufactured from aluminum. -
Microchip Technology introduces PAC1932/33 power monitoring devices
The PAC1932/33 devices include what is needed to measure power on a single Integrated Circuit (IC), integrating multiple channels in a single package for applications such as Point of Sale (POS) systems, ATMs and building automation. -
Silicon Designs announces Model 2422H MEMS variable capacitive accelerometer modules
Available in eight models, with standard ranges from ±2 g to ±400 g, the Model 2422H series is designed for zero-to-medium frequency vibration and acceleration sensing, in commercial and industrial applications where a hermetically sealed case and +5 VDC regulated power supply are absolute requirements. -
Larson Electronics announces EPS-PB10-DPDT explosion proof single push button switch
The EPS-PB10-DPDT from Larson Electronics is an explosion proof single push button switch rated at 10-amps and operates on 600V AC with a choice of ½” inch or ¾” hub sizes for connection. -
Weintek introduces cMT-iM21 touchscreen monitor
While it weighs 4.9kg, it has an aluminum enclosure, 6H anti-scratch tempered glass surface, and NEMA4/IP65 protection structure ensure that cMT-iM21 will serve as a monitoring assistant in industrial environments. -
Balluff releases BOS 21M ADCAP optical multifunction sensor
The sensor uses red light and lets users choose from among four sensor modes: background suppression, energetic diffuse, retroreflective or through-beam sensor. All the sensor functions can be configured over IO-Link while the system is running, so that a remote teach-in can be initiated by the controller. -
ABB introduces ABB Ability Connected Paint Atomizer
ABB’s paint atomizer is designed to double the operating time between manual cleaning from two to more than four hours for the externally-charged atomizer. The entire ABB painting system offers an environmentally friendly solution that provides real-time analysis and diagnostics. -
TRACO POWER releases TPP 450A series of 450 watt power supplies
The TPP 450A series consists of 6 single output models of (12~53 VDC). Standard features include; aux output of 5VSB / 2A and a 12V / 0.5 A for fan cooling, Remote Sense, Power Good and Remote On/Off. -
Thorlabs announces GAN610C1 and GAN620C1 imaging systems
For both systems, the user can switch between different A-scan rate presets ranging from 5 kHz to 248 kHz to achieve a balance between sensitivity and imaging speed. -
ABB releases ABB Ability Verification for measurement devices software
ABB Ability Verification for measurement devices is an extensible application that connects with field devices over their applicable protocols to provide in situ verification. It provides PASS / FAIL results together with relevant diagnostic information in a series of tests chosen by the user. -
AutomationDirect announces universal deep-hinged doors
The doors with polycarbonate windows are available in various sizes to fit compatible Hubbell-Wiegmann NEMA 3R, 4, 4X or 12 rated enclosures. -
Cincinnati Test Systems and Sciemetric Instruments introduce QualityWorX CTS DataHub
The QualityWorX CTS DataHub is a platform for collecting and analyzing data from up to five CTS Sentinel instruments at a time, without requiring IT support to set up. -
JAI introduces SP-12401-PGE 12.4 megapixel camera
The cameras are equipped with a standard GigE Vision interface capable of running at 9.3 frames per second for 8-bit monochrome or raw Bayer images at full resolution (4112 x 3008 for monochrome and 4088 x 3000 for color). T -
SignalFire introduces ModQ Sentry Modbus flow totalizer
The ModQ is designed for data management of turbine flow meters in new and retrofit installations for a variety of industrial applications such as oil & gas, metals & mining, water & wastewater, chemical, power, food & beverage, pulp & paper, aerospace, and pharmaceutical. -
Pepperl+Fuchs announces VisuNet RM Shell 5 firmware for VisuNet Remote Monitor HMI systems
VisuNet RM Shell 5 now supports an Application Manager for installing third-party application software and offers additional security and Windows update features. -
Axiomtek announces eBOX560-900-FL embedded computer
To meet a variety of Artificial Intelligence solution-ready system requirements, the AI embedded computer has one USB 2.0 port, two Gigabit Ethernet ports, one HDMI 2.0 port and four SMA type antenna connectors. -
Aventics announces Smart Pneumatics Analyzer
The user can connect the SPA to the compressed air supply on an existing machine, providing them with analysis options for key machine characteristics, such as compressed air consumption and possible leakages. -
Antaira introduces IMC-C1000-XX series of Ethernet-to-fiber media converter
This is designed for outdoor applications such as factory automation, security, ITS transportation, power/utility, water wastewater treatment plants, and any other extreme ambient weather environments. -
Kepware announces release of KEPServerEX version 6.5
KEPServerEX version 6.5 includes secure deployment guidelines, greater project file protection, enhanced password configuration and other updated security components. -
Asyril SA announces URCaps plugin for Universal Robots+ Solutions platform
Asyril’s URCaps plugin, available on the Universal Robots+ Solutions platform, enables integration of any Asycube in conjunction with any Universal Robot. -
Beckhoff announces ELX Series of EtherCAT Terminals with TwinSAFE SC technology
With the aid of TwinSAFE SC technology, it is possible to make use of standard signals for safety-related tasks in any network or fieldbus system. -
Rockwell Automation announces latest version of Connected Components Workbench software
Designers can now copy and paste code from the Connected Components Workbench software to the RSLogix 500 or Studio 5000 software and vice versa. -
DFI introduces KS070-AL/KS156-AL industrial touch panel PCs
The panel PCs are designed to meet the requirements within factory automation, transportation, and embedded applications. -
POSITAL announces multiturn absolute kit encoders
With POSITAL kit encoders, the control system always has complete information on the physical position of the mechanical components that it is directing. -
Beckhoff Automation announces TwinCAT 3 Building Automation software platform
TwinCAT 3 Building Automation meshes with existing TwinCAT 3 modules for HMI and IoT, along with Analytics and Scope, and bundles functions for building automation into one universal tool. -
TRACO POWER announces THM 15 family of DC-DC converters
These 15 Watt DC-DC converters provide isolation of 5,000 VACrms (250 VACrms working voltage) with reinforced insulation and low leakage < 2.5uA. All models are certified to ANSI/AAMI ES 60601-1:2005/(R) 2012 3rd Edition for 2xMOPP compliance and are suitable for B & BF rated applications. -
Emerson introduces Branson UWS40 ultrasonic splicer
The Branson UWS40 splicer is designed for productivity, whether deployed as a portable unit on a wire harness assembly board or on a tabletop. -
AutomationDirect introduces ProSense SC6 Series signal conditioners
ProSense SC6 Series signal conditioners are housed in a 6mm width package that allows high density mounting on a 35mm DIN rail to optimize panel space. -
Mek introduces PowerSpector BTL AOI systems
The Mek PowerSpector BTL AOI systems offer synchronized inspection of the top and bottom side of PCBs after Reflow, Wave or Selective soldering & placement of SMT & THT components. -
EXAIR introduces 2-1/2" and 3" Heavy Duty Line Vacs
Designed for industrial applications, Heavy Duty Line Vacs have a hardened alloy construction that are designed to prevent premature wear when transporting abrasive or heavy materials like shot blast, tumbling media or metal fittings. -
MINMAX releases MTQZ50 and the MTQZ75 DC-DC converter modules
The MTQZ50 and MTQZ75 DC-DC converter series, comprising of 8 models, integrate an I/O isolation of 3000VAC, offering input voltage ranges of 72 (43-101 VDC) and 110 (66-160VDC) with outputs of 5V, 12V, 15V, and 24V. -
Fluidwell introduces E126 explosion-proof flow computer
The E126 explosion-proof flow computer for corrected gas and liquid volume measurement measures the actual flow, temperature and pressure and converts it with a gas formula to gas volume at reference conditions. -
CAMI Research releases M4 low voltage continuity tester with twist pair relationship testing
CAMI Research, manufacturer of the CableEye automation-ready cable and harness test system, has developed the capability of checking and measuring twist pair relationships in cables as short as six feet. -
Sterling Systems & Controls announces Automated Feedmill Control System
Included in this Feedmill Automation System is the control and automation of Batching, Grinding, Material Receiving, Truck Scale and Loadout processes. Two (2) desktop PC’s are provided. -
Applied Motion Products introduces PS480D72 Switching Power Supply
The PS480D72 Switching Power Supply runs on 120 or 220V AC and provides 6.7 amps. The output of the supply is adjustable between 70 and 80 volts DC, making it compatible with drives and integrated motors that accept supply voltages in that range. -
Phoenix Contact releases VAL-US surge protection
The is Listed to UL 1449 and is available with up to 80 kA surge capacity. This line was developed specifically to conform to North American-centric voltage values and includes a variety of U.S.-based circuit configurations. -
NewTek Sensor Solutions introduces M-375 Series Miniature AC LVDT
The NewTek M-375 Series Miniature AC LVDTs provide dynamic measurement for machine operations such as robotics, automatic inspection equipment, plastic injection molding, hydraulic cylinder and valve positioning, downhole drilling, and dimensional gaging. -
Beckhoff introduces C6015 Industrial PC (IPC)
Measuring 82 x 82 x 40 mm, the C6015 IPC with multi-core technology can be installed in confined spaces and is equipped with an Intel Atom processor that offers up to four CPU cores. -
C&K announces SSW Detect Switch
The SSW Detect Switch has many attributes, such as Electric Parking Brakes (EPB) and x-by-wire, which each require functional safety in accordance with the ISO 26262 automotive standard, as well as any other applications where low-level signals are used. -
ABB announces OmniCore robot controller
The first OmniCore variants are designed to help integrate robots into the digital factory ecosystem, whether manufacturers need standardized motion control or more tailored solutions.




