Scroll down to search for more products...
Industry Products
Featured Products
-
Power CAD, Simulation & Digital Twins
Accelerate simulation, CAD, and digital twin workflows with the NVIDIA RTX PRO 6000 Blackwell Workstation Edition. Get powerful AI-enhanced performance, advanced visualization, and enterprise-ready capabilities for demanding projects. -
Precision Motion with Brother Servo Gearboxes
Compact, low-backlash servo gearboxes built to deliver precise motion, high torque density, and reliable automation performance. -
The Next Evolution in Process Control Is Here
DeltaV™ version 16.LTS Distributed Control System (DCS) builds on decades of field-proven innovation to deliver the most robust and reliable release yet. -
Connect Operations, Data, and Insights with GENESIS
Stop struggling with disconnected data. GENESIS unifies SCADA, visualization, historian, and analytics in one platform.
25,378 Products
-
Reliable Controls releases RC-Archive 3.6
RC-Archive is an SQL-based data acquisition application used to create long-term trend logs archived from multiple buildings. RC-Archive maintains an SQL database of trend log data, which is accessed by Reliable Controls workstation software -
Servo2Go introduces STAC6-Q-H motor drive
The drive is powered by single-phase 120 VAC which generates a nominal 160 volt DC internal bus voltage capable of driving NEMA 34 and 42 frame step motors. -
Servo2Go introduces DVC series of CANopen motor controllers
Specific applications include: mobile robots, AGV’s, UGV’s, material handling and transport vehicles in both industrial and military environments. -
Bristol Instruments introduces OMR700 digital chart recorder
This instrument is available with up to 96 input channels and can record from two hours to 132 years of data—depending on the number of channels and frequency of data acquisition. -
AutomationDirect introduces Mersen STXR series of surge protectors
Available in 120-600VAC models and a 200kA short-circuit current rating, these devices are ideal for use in ANSI/UL Type 1 or 2 SPD installations, such as AC distribution, power supplies, drive protection, fire alarms, control panels, and more. -
Hydratight announces Profile Slide Attachment for pipeline machining
The Profile Slide Attachment has been custom designed by Hydratight for heavy cutting and beveling at the pre-weld stage in combination with the company’s clamshell lathe range. -
FSG releases MH609y-II-Can series of rotary encoders
With a diameter of 22.2 mm and a case that is less than 39 mm long, the encoders (80 g) come with an integrated redundant Hall sensor for detecting 0-360° angles and a CAN-Bus interface. -
Aucotec to introduce Project Status Manager for plant design at Hannover Messe
The module of the database-driven CAE platform Engineering Base (EB) can both automate workflows within the system as well as exchange data with all types of external systems -
Abaco Systems announces SWE540 Ethernet switch
This solution targets embedded computing (HPEC) applications requiring the transfer of large amounts of data with low latency such as radar, surveillance, situational awareness and imaging -
Dataforth adds MAQ20-DIV20 and MAQ20-DODC20SK to the MAQ20 system
The MAQ20 system was developed for factory, process, and machine automation; power and energy, oil and gas, and environmental monitoring applications, and also for use in many test and measurement applications. -
Teledyne DALSA releases Genie Nano C4900 image sensor
The Genie Nano C4900 delivers improved network integration, a rolling shutter and low-light performance as a result of its 1/2.3-inch format, 1.25 μm active-pixel digital imager with A-PixHS BSI technology. -
Fluke introduces 1630-2 FC Stakeless Earth Ground Clamp
The 1630-2 FC is part of Fluke Connect allows technicians to view, record, and share measurements from the clamp and automatically upload them to Fluke Cloud storage along with tags and the GPS location of assets. -
AutomationDirect introduces CTF series of 5A current transformers
Designed for applications such as ammeters, wattmeters, panel meters, instrumentation, and energy management systems, these current transformers offer a means of measuring primary current. -
Applied Motion introduces SWM series of integrated steppers
The SWM24 integrated steppers combine NEMA 24 step motors with a 6.0 A/phase (peak-of-sine) step motor drive. -
POSITAL adds PROFINET interface to IXARC rotary encoders
Areas of application for these encoders include oil and gas facilities, underground mines, chemical plants, milling operations and grain-handling facilities. -
Define Instruments introduces Zen RTU Mini SCADA for data acquisition
Designed for DAQ applications requiring the collation of multiple signals and signal types from industrial sensors, the Zen RTU Mini collates up to 16 signals for direct routing to SCADA systems and PLCs. -
Bestech Australia introduces the capaNCDT 6112 displacement measurement sensor
The capaNCDT system can be used for thickness, coordinate and oscillation measurements, as well as brake test stands. Other applications can be found in R&D, semiconductor production, automation, medical engineering and machine building. -
Comark announces EDT1700 EnduraTouch II series of industrial computer
The EDT1700 is a fit for applications such as total wash-down spray areas, areas requiring resistance to bacteria, sanitation areas, high temperature areas, or in wet, dirty or corrosive environments. -
Fluke announces Fluke 1732 and 1734 three-phase energy loggers
These loggers capture key measurements — voltage, current, power, power factor, and other variables like temperature — to enable managers to understand their energy usage and correlate it to their activities. -
AMETEK releases PTC-425 temperature calibrator
The PTC-425 has a temperature range of 33C to 425C (91F to 797F) making it ideal for sterilization tunnels as well as validation and monitoring applications in the pharmaceutical, medical and food industries. -
BEI Kimco releases LA05-05 and LA15-16 models of actuators
BEI Kimco’s low out-gassing VCAs are suitable for a wide variety of demanding OEM environmental conditions such as semiconductor, military, aerospace, microelectronics, test and measurement, and industrial manufacturing applications. -
Hexagon Manufacturing Intelligence announces RS4 Scanner for ROMER Absolute Arms
The ROMER Absolute Arm SI with the RS4 scanner is ideally suited for point-cloud inspection, product benchmarking, reverse engineering, rapid prototyping, virtual assembly and CNC milling. -
Ubiqconn Introduces Ucom-al6c Computer On Module
uCOM-AL6C is designed to fit the demanding requirements in Embedded IoT, smart factory, smart edge gateway and other Industrial 4.0 related applications which design of power and space is critical. -
CAMI Research releases CB52 interface board for CableEye testing system
The CB52 is intended for periodic calibration verification of the Kelvin 4-wire resistance measurement module -
System introduces Multigecko Special automated sorting system
The System packaging process is a system designed also for those needing to pack special parts, and small to medium sized components, such as strips, hexagons, ribbed tiles and skirting panels. -
Aricent and Rohde & Schwarz partner to enhance cybersecurity on R&S PACE 2 DPI software library
Rohde & Schwarz Cybersecurity network security technology will be made available as part of Aricent’s Evolved Packet Core (EPC) Software Framework and Aricent’s Intelligent Switching Solution. -
Emerson introduces SDU AC series of 120VAC and 230 VAC UPS
Emerson is targeting the UPS at industries that rely heavily upon robotics, factory automation, PLCs, conveying equipment, CNC machinery, and throughout the Industrial Internet of Things (IIoT) environment. -
United Electric announces Vanguard WirelessHART gas detector
Vanguard field-interchangeable gas sensor modules detect and record hydrogen sulfide (H2S) or methane (CH4) gas in parts per million (PPM) or percent of lower explosive limits (LELs) respectively, along with network and battery status. -
VPG introduces the Powertron PCS series of power current sensors
Typical applications for the Powertron PCS Series include medical instrumentation, high-end measuring equipment, high-precision power supplies, battery management, and power converters. -
Microchip Technology announces zigbee alliance-certified zigbee development platform
This software stack, and corresponding BitCloud 4.0 software development kit, is ideal for the design of home automation, commercial lighting, smart energy and Internet of Things (IoT) applications. -
Vecow announces ECS-9755/9771 GTX950 Series GPU Computing System
Vecow's ECS-9755/9771 GTX950 Series GPU Computing System is a solution for Machine Vision, ITS, Embedded Workstation, Vehicle Computing, Telemedicine, Artificial Intelligence and any real-time graphics performance driven IIoT/Industry 4.0 embedded applications. -
IBASE introduces IB916 single board computer
The IB916 single board computer is designed for a broad range of applications requiring compute and graphics performance at lower power consumption, such as those found in factory automation, kiosk, communications, gaming and digital signage environments. -
Intersil releases ISL32704E RS-485 transceiver
The ISL32704E is suited for the equipment-to-bus interface in IIoT networks that connect programmable logic controllers (PLCs) to instruments, robots, motor drives, data acquisition and digital I/O modules. -
ABB announces launch of K-TEK LMT series of level transmitters
By adopting the ABB two-wire common transmitter design combined with advanced signal processing, LMT delivers measurements with an integrated setup menu, advanced diagnostics with waveform display and signal conditioning. -
Rockwell Automation releases FactoryTalk View v9.0
The latest version of FactoryTalk View software from Rockwell Automation is designed to improve the operator’s experience with data-driven information while also delivering design-time productivity via tighter integration with the control system. -
Columbia Machine introduces FL6200 palletizer
The FL6200 utilizes Columbia’s Product Manager HMI, servo-actuated layer transfer and load building area hoists, servo actuated bi-parting apron plates and modular construction that allows for multiple layout configurations to fit site constraints. -
Advanticsys introduces IIoT gateway for MPC-330 data concentrator
Advanticsys adds to its Modbus data concentrator the ability to integrate into any IoT software platform using the Message Queue Telemetry Transport (MQTT) protocol. -
Rethink Robotics announces Intera 5 robotic control software
Built on the backbone of train-by-demonstration software that powers robots, Intera 5 is designed for connected manufacturing environments and helping companies build factories of the future. -
Custom Automation & Machinery releases SEP-10T powder compacting press
The equipment is designed to benefit all industries which mold components with powder volumes of up to 5 cubic inches, including the automotive, sealing technologies (gaskets), medical devices, pharmaceutical, and oil & gas industries. -
Mencom introduces CDSH series of SQUICH spring terminal rectangular connectors
These are single connectors with a maximum number of 84 poles that occupy the same space of standard connectors with screw/spring connections -
PI introduces L-402 linear stage
The stage comes with the choice of two direct-drive motors, a DC servo motor with closed-loop encoder and 2-phase stepper motor. Other encoder options for OEMs are also available. -
WIN announces availability of wireless process sensoring and monitoring solutions
Common applications include: motor temperature and current draw, pump vibration, bearing vibration or temperature monitoring, conveyor vibration monitoring, exhaust and cooling tower fan monitoring, filter monitoring and more. -
Mass Flow ONLINE releases MV-108 flow meter & MV-308 flow regulator
Both models have 4 pre-installed ranges (100%, 40%, 20% and 10% of maximum FS range) selectable, using a 4-way navigation button. The user can select one out of the 10 pre-installed gases – Air, N2, O2, Ar, CO, CO2, N2O, CH4, C3H8, C4H10 -
Bel Power Solutions releases MELCHER HP series of DC-DC converters
The converters deliver up to 192 watts with efficiency up to 93% over input and load range with no derating over the operating ambient temperature range of -40° to 70°C. -
SMC Diode Solutions introduces the SD560B rectifier
The SD560B rectifier combines a 2.5mm profile with an average rectified output current (IO) rating of 5A continuous and a reverse voltage (VRRM) rating of 600V. -
Silicon Designs announces Model 2210 series accelerometers
Model 2210 MEMS VC accelerometer modules are designed for lower frequency vibration testing requirements, including vibration analysis, machinery control, modal analysis, robotics and crash testing. -
Stealth.com releases LPC-800 series of fanless mini PCs
The LPC-800 series is designed to operate on a range of 9-48V DC power input making it a fit for mobile, marine, transportation, field and remote based applications. -
MDT Software announces release of AutoSave Universal Suite
AutoSave Change Management Software protects, saves, restores, discovers, and tracks changes in industrial programmable devices and files/groups of files. -
BOGEN introduces IKS9 magnetic measuring head
The measuring head IKS9 is now available in 9 mm width. BOGEN has been developing and producing magnetic heads for demanding applications since 1951. -
Bedrock Automation announces Cybershield 2.0 firmware and SCC.X controller
Bedrock Cybershield 2.0 firmware enables authentication and encryption of I/O networks and field devices and protects compliant networks and user applications such as controller configuration, engineering and SCADA. -
Moticont releases SDLM-025-095-01-05 and SDLM-025-095-01-01 direct drive linear actuators
The SDLM-025-095-01-05 and SDLM-025-095-01-01 Direct Drive Linear Actuators are also available as a complete plug-and-play linear motion system with a matching motion controller. -
AutomationDirect introduces EPS series of digital pressure sensors
The EPS series of digital pressure sensors are designed for industrial pressure measurement and indication in both gas and liquid applications. -
Sightline Systems releases EDM for Manufacturing predictive analytics software
EDM for Manufacturing assists process and quality engineers by correlating thousands of data points collected in real time from sensors, SCADA systems, historians, PLCs and more. -
Red Lion adds Ramp Soak capability and FlexCard plug-in options for PAX2C PID controllers
Red Lion’s PAX2C PID controllers offer PID control options for process and temperature applications that require local control across automation processes. -
Divelbiss announces HEC-P6000 family of controllers
The HEC-P6000 family is designed for controlling mobile equipment, communicating with various serial buses and communications protocols, logging system data, and adding IoT capability to existing systems with the Divelbiss VersaCloud M2M platform. -
Nordson MARCH introduces PD Series of Plasma Deposition Systems
Plasma deposition can be used for applications in a wide range of industries, including medical, life sciences, industrial, semiconductor, MEMS, plastics, and electronics. -
METTLER TOLEDO introduces Rainin SmartStand for pipette management
Each Rainin SmartStand holds up to four manual or electronic Rainin XLS pipettes and automatically charges electronic pipettes when they are placed on the stand. -
Zygo introduces ZPS absolute position measurement system
The ZPS system enables precision measurement and positional control for advanced applications, such as deformable optics, lens positioning systems, and fine stage control. -
Process Sensors introduces PSC-SR80NV non-contact 2-color ratio thermometer
The dual or single wavelength IR pyrometer PSC-80NV series is designed for use in for metals, heat treating, kilns, molten glass, composites, casting-metal pouring streams, vacuum furnaces, welding, sintering and R & D applications. -
Schneider Electric partners with Seeq to release EcoStruxure Profit Advisor
EcoStruxure Profit Advisor uses Big Data analytics to measure the financial performance of an industrial operation in real time, from the equipment asset level of a plant up to the process unit, plant area, plant site and enterprise levels. -
EVT introduces EyeFi filament inspection sensor
The sensor contains of two cameras with an Aptina sensor and an S-Mount lens. Also in the package is the EyeVision image processing software. -
Delphin Technology introduces Custom Measurement Case with OPC UA interface
The measurement case combines two important applications to make it a practical device for manufacturing operations: collecting Energy Consumption data and performing Fault Analysis. -
NEXCOM introduces ISA100.11a Gateways for industrial wireless networks
NEXCOM's NIO 200 ISA100.11a gateways are designed help production managers oversee manufacturing operations and activities across plants using industrial wireless networks. -
Hexagon Manufacturing Intelligence releases PC-DMIS 2017 R1 measurement software
PC-DMIS 2017 R1 debuts two accessory applications designed for the shop-floor environment, Inspect and Notification Center. -
Spirax Sarco releases EP500 electropneumatic valve positioner
The EP500 has a cast aluminum enclosure that is suitable for outdoor installations. It utilizes force-balance control technology and can be mounted onto pneumatic actuators with strokes between 10mm and 70mm. -
MicroPower Direct releases MD100x series of DC/DC converters
The MD100x series is a solution for a variety of board level power distribution applications. -
The Sensor Connection relases ILPS-19 series of linear position sensors
ILPS-19 sensors are designed for both industrial testing laboratories and OEM applications. -
TT Electronics introduces Photologic V OBP9000 optical sensor
The OPB9000, under the OPTEK brand, is suitable for a variety of applications including: industrial printing, dispensing, manufacturing automation, safety and security devices, portable lab/medical equipment. -
AutomationDirect introduces MTRP series of 56HC frame motors
The rolled steel motors are available in 1800 and 3600 RPM models and feature 4:1 constant torque and 10:1 variable torque speed ranges, TEFC frames, cast aluminum end bells and removable mounting bases. -
Moore Industries releases SFY functional safety frequency-to-DC transmitter
The SFY is designed and approved for use in a variety of processes and factory automation SIS including turbine flow meters, magnetic pickups, dry contact closures, variable frequency drives, turbine tachometer generators, rotating equipment, motor and conveyor speed as well as pulse and frequency output transducers. -
GE Automation & Controls announces its Industrial Internet Control System
IICS consists of a combination of connected controllers, I/O modules, secure cloud connectivity, advanced analytics software and apps, used to collect and analyze data to then send back specific decisions as commands to the individual machine controllers. -
igus releases xiros 67 and 68 thin ring bearings
The xiros 67 and 68 thin ring bearings are suitable for temperatures ranging from -40º - 176º F, and are available in two materials (xirodur B180 and S180) with inner diameters ranging from 4-30mm -
Bedrock Automation introduces SIO8.20 discrete output module for Bedrock OSA system
The SIO8.20 DO enables software selectable electronic fusing, latching and fail-safe shutdown for each 24 VDC output at 1 A max current per channel. It provides galvanically-isolated output switching in an all-metal enclosure. -
Alliance Sensors releases GHS-19 series of LVIT gaging sensors
The GHS-19 series are ntactless devices designed for dimensional gaging and position measurements in factory automation and in various industrial and commercial applications. -
Wibu Systems announces CodeMeter Embedded 2.0
CodeMeter Embedded 2.0 is a runtime environment that supports an array of platforms and operating systems intelligent device manufacturers (IDMs) rely upon, including Intel x86, PPC, ARM, Windows, Linux, Android, VxWorks, and QNX.




